Skip to main content

Hitachi introduces new Global e-Service remote machine monitoring systems

Hitachi Construction Machinery (Europe) has created two new remote machine monitoring systems that have been developed as part of its Global e-Service online application. Available in many languages, Owner’s Site and ConSite are introduced for Zaxis-3 and Zaxis-5 medium and large crawler, and wheeled excavators, as well as ZW-5 wheeled loaders. Global e-Service allows owners to monitor their Hitachi construction machinery remotely. Machines send operational data on a daily basis via GPRS or satellite to w
April 23, 2015 Read time: 2 mins

233 Hitachi Construction Machinery (Europe) has created two new remote machine monitoring systems that have been developed as part of its Global e-Service online application.

Available in many languages, Owner’s Site and ConSite are introduced for Zaxis-3 and Zaxis-5 medium and large crawler, and wheeled excavators, as well as ZW-5 wheeled loaders.

Global e-Service allows owners to monitor their Hitachi construction machinery remotely. Machines send operational data on a daily basis via GPRS or satellite to www.globaleservice.com. This allows immediate access to the new and improved Owner’s Site, and the vital information that is required to support Hitachi machinery and operations on construction job sites.

An automatic service report, ConSite sends a monthly email summarising the information from Global e-Service for each Hitachi machine. This includes a detailed analysis of the operational data, ratios and hours.

The operational data highlights daily working hours and fuel consumption in a colour-coded calendar format. This gives an insight into how productive and efficient each machine has been in the past month.

In addition, in the event of a fault, an emergency alarm report is sent to the owner and the local authorised Hitachi dealer for immediate action.

“Owner’s Site and ConSite will provide information that they can use to maximise the efficiency, minimise downtime and improve the overall performance of their Hitachi fleets,” says Tom van Wijlandt, HCME’s assistant manager service development.

For more information on companies in this article

Related Content

  • From managed asset to service provider: the future highway
    May 20, 2019
    Every day we hear about Mobility as a Service (MaaS), but what about Roads as a Service? Geoff Hadwick reports from the ERF in Brussels The familiar physical asset called the road will increasingly be seen as part of an emerging global services sector. Given that, the role of the road is changing, notes Christophe Nicodème, general director of the European Union Road Federation (ERF). We need to think much more carefully about planning highway infrastructure in terms of people’s needs, said Nicodème,
  • New engine options for Atlas Copco and Hitachi
    December 17, 2014
    Both Atlas Copco and Hitachi have selected new low emission engines for some of their latest machines being made available in Europe and North America. For Atlas Copco, this has seen the firm installing diesels from John Deere Power Systems to drive a number of its new air compressors. Meanwhile Hitachi is now installing Deutz diesels in a number of its new wheeled loaders. The John Deere PowerTech Tier 4 Final /Stage IV engines will power three new air compressors from Atlas Copco. The Atlas Copco XAS 7
  • Komatsu introduces 3D machine guidance and payload functions for crawler and wheeled excavators
    April 5, 2024
    Drawing on a decade of experience and a deep understanding of the intelligent Machine Control system, Komatsu now offers Smart Construction 3D Machine Guidance kit as a simple and flexible technological enhancement for a broad range of standard Komatsu machines and mixed fleets.
  • Transylvanian motorway breaks new ground in engineering
    July 11, 2012
    Normally in hilly ground, we would use the excavated soil from the cuttings to fill the valleys," says Bogdan Sgarcitu, External Affairs Manager of construction company Bechtel. "But on this stretch the clay-like soil cannot be compacted, so we've had to use many more piles than normal: in just three months we installed more than 500, some drilled as deep as 24m. We've also had to transport millions of tonnes of materials over some less-than-perfect infrastructure."