Skip to main content

Hitachi EX1900-6 increases productivity at Swinden, UK quarry

Materials supplier Tarmac has invested in a Hitachi EX1900-6 ultra-large excavator for its Swinden Quarry in North Yorkshire, England. The EX1900-6 is used to load up to 1,200 tonnes of carboniferous limestone per hour directly into a 200tonne mobile crusher. A field conveyor takes the material to a secondary crusher at an average rate of 1,000tonnes/hour. The Hitachi model was supplied with a longer boom and arm, and a smaller 8m³ bucket, customary on a machine of this size. “This is because it needs
January 26, 2017 Read time: 3 mins
Hitachi EX1900-6 ultra-large excavator in Yorkshire
Materials supplier Tarmac has invested in a Hitachi EX1900-6 ultra-large excavator for its Swinden Quarry in North Yorkshire, England.

The EX1900-6 is used to load up to 1,200 tonnes of carboniferous limestone per hour directly into a 200tonne mobile crusher. A field conveyor takes the material to a secondary crusher at an average rate of 1,000tonnes/hour.

The 233 Hitachi model was supplied with a longer boom and arm, and a smaller 8m³ bucket, customary on a machine of this size. “This is because it needs a larger working range to reach the limestone and load the crusher,” said Mark Turnham, mines and quarries manager at Hitachi Construction Machinery (UK).

“It means the primary crusher doesn’t need to be moved as frequently. This can take 45 minutes, so it enhances the efficiency of the process.”

The ultra-large excavator was also supplied with Hitachi Genuine Ground Engaging Tools, which HCM said further enhance productivity by improving penetration and overall digging power. The edge shrouds for the bucket and long penetration teeth are manufactured from high-grade steel and tested to the same standard as all Hitachi construction equipment.

Swinden Quarry produces various sizes of aggregates, from 100mm down to dust - including grades of 80, 40, 28, 20, 14, 10 and 6 - which are dry stored in silos. The material is either transferred directly to the site’s rail siding via conveyor to the fully-automated truck load-out, or into the ‘toast rack’ storage, from which a wheeled loader directly loads customers’ trucks.

Around 60% of the materials are transported 60km by rail to 2399 Tarmac’s dry distribution centres in Leeds, for onward transportation to South Yorkshire, and a depot in Hull, nearly 100km away. Much of the limestone is used in Tarmac’s concrete and asphalt plants in the north of England.

With the arrival of the EX1900-6, Tarmac intends to maintain production levels and annual output of 2.3 million tonnes. “During the tender process, we looked at productivity and fuel consumption,” said quarry manager Jez West. “We wanted to reduce operational hours by increasing productivity.”

Operator George Metcalf, who has worked around the machine since its delivery in November, said that the speed and productivity is faster than other machines he has used. “There is also good all-round visibility. The cab feels more open and spacious, the seat is comfortable and the controls are easy to use.”

For more information on companies in this article

Related Content

  • Qatar quarry boosts output with SDLG wheeled loaders
    February 8, 2018
    A fleet of SDLG wheeled loaders is helping to optimise production at a quarry in Qatar. The three SDLG wheeled loaders are operating long hours and are being used to feed crushing and screening equipment at the site in Qatar. The three SDLG LG958L wheeled loaders have managed to clock 2,000 operating hours in four months at the quarry. The site is owned by Doha-based contracting company Al Maram International, which uses crushing and screening equipment to reduce and sort limestone, primarily for asphalt
  • Doosan’s Cumbrian Way
    July 20, 2012
    Thomas Armstrong (Aggregates) in Cumbria, North West England, has taken delivery of two new Doosan Infracore DL420 wheeled loaders. The new machines, supplied by Doosan Cumbria and southern Scotland dealer Lloyd Ltd, are the third generation of Doosan wheeled loaders to be purchased by the company over the last 10 years. Operating at the Thomas Armstrong (TA) quarries at Overby and Newcowper in Cumbria, the new Doosan DL420 wheeled loaders succeed the company’s Doosan DL400 wheeled loaders which, in turn,
  • Nigeria’s Eko Atlantic project: a city on the sea
    September 27, 2013
    Imagine a megapolis rising, Atlantis-like, from the sea. An urban development similar in size to New York’s Manhattan that boasts thriving business and residential districts to help transform not just a city but an entire country. It sounds like the stuff of science fiction. But the Eko Atlantic project in Lagos, Nigeria, is real and has become one of the most dazzling and most discussed construction developments in the entire world. One hundred years ago, the area of land on which the new city will be bu
  • Tarmac goes low-carbon on UK’s A64
    December 20, 2024
    The trial was delivered on a 2.4km section of England’s A64 strategic highway, the eastbound carriageway at junction 44 near the town of Bramham in North Yorkshire county.