Skip to main content

Highways England launches Maintenance Assistance Vehicle - MAV

Highways England has developed a vehicle to help replace overhead highway signs that it says will reduce the need to close lanes and roads during work The vehicle uses a hydraulic scissor lift similar to that seen on catering vehicles that load food into the hold of airplanes at airports. Traditionally, signs are taken down and installed using a flatbed truck, crane and cherry picker, taking up to 40 minutes. However, the Maintenance Assistance Vehicle (MAV) can do this in around 20 to 25 minutes by usin
July 7, 2016 Read time: 2 mins
Easier access with the MAV from Highways England
8100 Highways England has developed a vehicle to help replace overhead highway signs that it says will reduce the need to close lanes and roads during work

The vehicle uses a hydraulic scissor lift similar to that seen on catering vehicles that load food into the hold of airplanes at airports. Traditionally, signs are taken down and installed using a flatbed truck, crane and cherry picker, taking up to 40 minutes. However, the Maintenance Assistance Vehicle (MAV) can do this in around 20 to 25 minutes by using a small jib crane which is part of the vehicle.

Road workers have trialled the MAV and have had to shut down fewer lanes for the operation. Highways England said the device provides a safer environment for workers because they are standing on a sturdy platform.

Once the platform is raised to the required working height, the jib crane attaches to the sign on the gantry and lifts it off.  Operatives then detach the sign, place it onto a trolley on the platform and wheel it into the main compartment of the vehicle. The procedure is reversed when installing an electronic sign.

The hydraulically powered scissor lift enables the signs, which are often found on smart motorway gantries, to be serviced at heights of up to 8.5m and in wind speeds of up to nearly 50kph. CCTV cameras enable the MAV driver to park the vehicle in the correct place below the gantry before any maintenance takes place and monitor operatives working at the back.

Highways England said it is examining the best way for its contractors to purchase the machines. It is estimated that if the device were widely adopted it could save up to €5 million a year. Consideration is also being given as to whether it could be used to improve safety for other duties on England’s motorways and major A roads.

For more information on companies in this article

Related Content

  • SWARCO sets up live-lane running in Germany
    February 28, 2023
    SWARCO’s system spans 2.8km along the hard shoulder of the A8 motorway between Karlsruhe and Karlsbad in southwest Germany.
  • EU project looks at highway parking areas
    February 24, 2012
    Under the EU-funded LABEL project there will be an analysis of secure trucking stops. The European Union Road Federation (ERF) - International Road Federation (IRF), Brussels Programme Centre, looks at what it can achieve Whenever we have to travel long distances by car we are faced with the prospect of having to stop in order to refuel our vehicle and to rest a bit. As a consequence motorways can boast the presence of a high number of service stations, usually spread out at 20 to 30km intervals, ready to
  • Vysionics helps Scottish watchdog A9 Safety Group win CIHT award
    September 16, 2015
    An installation of SPECS3 average speed cameras from Vysionics has helped a Scottish road safety watchdog win an award The A9 Safety Group, which monitors traffic, accidents and driving habits and conditions along the A9 trunk road, picked up the John Smart Road Safety Award from the CIHT - Chartered Institution of Highways and Transportation. The CIHT is concerned with planning, design, construction, maintenance and operation of land-based transport systems and infrastructure. A9 Safety won the award
  • Innovations in formwork aid project completion
    February 14, 2012
    Innovative formwork solutions are helping to get projects completed on or before time, meaning savings in time and money as Patrick smith reports. The use of flexible, modular formwork to create innovative structures out of concrete is helping to increase productivity and thus drive down completion time and costs.