Skip to main content

HIGHWAY TO THE HEART

Poland's A1 highway project is developing a reputation as a route to stable relationships. At present some 25 married couples are working on the project for Swedish contractor Skanska. Eight of the couples actually met while working on the highway while 10 opted to marry once the project got underway and 11 were already married when work commenced
March 6, 2012 Read time: 1 min
Poland's A1 highway project is developing a reputation as a route to stable relationships. At present some 25 married couples are working on the project for Swedish contractor 2296 Skanska. Eight of the couples actually met while working on the highway while 10 opted to marry once the project got underway and 11 were already married when work commenced.

For more information on companies in this article

Related Content

  • Pūhoi-to-Warkworth motorway project
    September 25, 2020
    After a hiatus because of the COVID-19 lockdown, work has restarted on what will be one of New Zealand’s most visually impressive motorways. Andrew Thackwray, senior manager for project delivery for Waka Kotahi, the New Zealand Transport Agency, explains
  • Norway’s plan for road development
    March 21, 2019
    Norway is pushing ahead with a comprehensive plan of road development. The country’s state-owned contractor, Nye Veier, plans to commence work on a series of road projects during 2019. In all these projects will be worth more than €2.3 billion (NOK 22 billion). The plans call for 52km of highways to be constructed, with the Tvedestrand to Arendal link being the first to be buit.
  • Higher production from all-wheel-drive haulers
    August 2, 2012
    The improvements to articulated dump trucks (ADTs) have been substantial in recent years. Comparing a present day machine with one from 20 or even just 10 years ago shows how far design has come. Major improvements have been made in visibility, operator comfort levels, rough terrain performance, driveline efficiency and productivity, to name but a few key areas. All of the latest generation ADTs available on the world market now come with Tier 3/Stage IIIA compliant diesels that produce far lower noise and
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during