Skip to main content

HIGHWAY TO THE HEART

Poland's A1 highway project is developing a reputation as a route to stable relationships. At present some 25 married couples are working on the project for Swedish contractor Skanska. Eight of the couples actually met while working on the highway while 10 opted to marry once the project got underway and 11 were already married when work commenced
March 6, 2012 Read time: 1 min
Poland's A1 highway project is developing a reputation as a route to stable relationships. At present some 25 married couples are working on the project for Swedish contractor 2296 Skanska. Eight of the couples actually met while working on the highway while 10 opted to marry once the project got underway and 11 were already married when work commenced.

For more information on companies in this article

Related Content

  • Chinese firm for Cameroon highway contract
    February 8, 2024
    A Chinese firm will carry out a key Cameroon highway contract.
  • Volvo CE Q1 2013 net sales down 33% - but firm maintains profitability
    April 25, 2013
    Volvo Construction Equipment (Volvo CE) said sharply lower global demand, especially in the mining sector, during the first three months of 2013 had caused its 33% net sales decline in the quarter to US$1.829 billion (SEK 12,136mn). The Swedish construction equipment manufacturing giant’s operating income was also down in Q1 2013 to $75.38 million (SEK 500mn), compared to $314.97 million (SEK 2,089mn) in the first quarter of 2012, while operating margin was 4.1%, down from 11.6% in Q1 2012. Volvo CE said it
  • ERF invites Polish Road Congress’ perspective on Road Markings
    May 14, 2014
    On 5 March 2014, the Polish Road Congress organised a consultation seminar on road markings standards across the EU The conference followed the publication of the latest proposal by the ERF for an EU-wide intervention and maintenance policy for road markings, commonly known as 150x150. The proposed policy illustrates the ERF’s view that road markings should have a minimum width of 150mm for all roads, and their performance should not be allowed to drop below 150mcd/lux/m² (R3) in dry weather conditions a
  • Skanska’s sophisticated satellite system saves fuel
    April 23, 2013
    Satellite vehicle tracking technology from Isotrak is helping Skanska UK’s utilities business save on fuel and be kinder to the environment by reducing emissions. Using the real time system to track the company’s mobile workforce on the road enables efficient vehicle management and provides detailed reporting on individual driving styles for each driver. This is said to have enabled Skanska UK, a leading utility infrastructure and asset management provider, covering telecommunications, gas, power and water