Skip to main content

Highway delineator system aids crash reduction

A new delineator design is said to be helping to reduce accidents on a 200mile stretch of one of the world’s most treacherous highways. Pexco LLC has produced the ‘Dalton Delineator’ for the Dalton Highway, a remote 414mile road in Alaska, reported to be the sixth most dangerous roadway in the world. The road safety system has a cantilever structure consisting of a short length of a Davidson Flexi-Guide FG 400 Roadside Delineator post mounted to a special flexible coupler.
March 21, 2012 Read time: 2 mins
The Dalton Delineator aims to reduce crashes on one of world’s most dangerous highways
A new delineator design is said to be helping to reduce accidents on a 200mile stretch of one of the world’s most treacherous highways. 301 Pexco LLC has produced the ‘Dalton Delineator’ for the Dalton Highway, a remote 414mile road in Alaska, reported to be the sixth most dangerous roadway in the world.

The road safety system has a cantilever structure consisting of a short length of a Davidson Flexi-Guide FG 400 Roadside Delineator post mounted to a special flexible coupler. The polyurethane-made coupler is attached to a square steel tube support by the roadside. The delineator post, also known as an arm, projects horizontally out from the shoulder, above the roadway. The use of white delineator arms on one side of the road and green delineator arms on the opposite side, likened by Pexco LLC to the running lights on a boat, is said to give motorists and highways maintenance workers clear indication of their position on the road, even in the midst of a blinding snowstorm.

Half of all vehicle crashes on the Dalton Highway occur during daylight hours, while a quarter take place at night when drivers are travelling on non-lighted sections of the road.

The installation of the Dalton Delineator, which began in summer 2011, comes after Alaska DOT asked Pexco LLC in early 2009 to come up with new ideas to build on the success of its existing Dalton Highway FG 400 Roadside Delineator post.

For more information on companies in this article

Related Content

  • Powerful reclaimer/stabiliser aids road upgrade
    March 15, 2012
    A US contractor is upgrading rural Pennsylvania roads with the aid of a powerful new reclaimer/stabiliser Much of the United States highway infrastructure continues to deteriorate due to lack of a comprehensive road bill and eroding investment in the nation’s roads. However, some of the country’s secondary and rural roads are being upgraded, and funding is coming from unlikely private sources. Energy companies with stakes in the Marcellus and Utica deep shale gas reserve development are working with local
  • Defective eyesight, a road safety concern?
    February 16, 2012
    Failing eyesight presents safety problems for Europe's older drivers. A new report highlights substantial variation in the assessment of drivers' vision across Europe, and recommends that Member States make moves to better assess drivers' vision. Checking the vision of drivers plays a valuable role in the EU's target of halving road deaths across the EU by 2020. The aim is to achieve this road safety improvement by legislative means that change driver behaviour, raise the technical standards of vehicles and
  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.