Skip to main content

High quality, low maintenance lighting

Philips has partnered with Northumberland County Council in the UK to provide a low maintenance lighting solution that produces high quality white light. Northumberland County Council required a low maintenance solution that was environmentally friendly and could serve a diverse environment. Philips was able to provide an LED solution that improved light quality at night, whilst also reducing maintenance costs and time. Philips’ SpeedStar luminaire, incorporating LEDGINE Greenline, was used for this pro
February 15, 2012 Read time: 2 mins
High light quality and low maintenance costs are claimed for the new lighting systems from Philips
2368 Philips has partnered with Northumberland County Council in the UK to provide a low maintenance lighting solution that produces high quality white light. Northumberland
County Council required a low maintenance solution that was environmentally friendly and could serve a diverse environment.
Philips was able to provide an LED solution that improved light quality at night, whilst also reducing maintenance costs and time. Philips’ SpeedStar luminaire, incorporating LEDGINE Greenline, was used for this project. This combines an innovative carbon neutral design with a long lifetime of 60,000 hours, while providing major savings through reduced maintenance. The SpeedStar luminaire is said to benefit from excellent lighting levels. Its white light, perceived as being brighter and more natural when compared to yellow light, increases visibility for motorists and pedestrians, boosting safety. Philips tailored the project’s installations to meet the requirements of a coastal location. To protect these, Philips used an IPX700 marine grade coating on all new columns.

For more information on companies in this article

Related Content

  • The Preston Western Distributor
    September 7, 2023
    Costain, as main contractor for the Preston Western Distributor project, was involved from the earliest stages, thanks to the UK’s Early Contractor Involvement approach. The project was delivered on time and on budget to the benefit of the local environment, local businesses and the region’s workforce. David Arminas reports*
  • Upgrade for Medieval bridge
    February 29, 2012
    One of the most demanding and challenging impressed current cathodic protection (ICCP) projects ever undertaken by specialist main contractor Concrete Repairs Ltd (CRL) is being carried out on Bideford Longbridge in County Devon, UK. The 24-span medieval masonry arch bridge spans 190m over the tidal estuary of the River Torridge.
  • Highways England opts for warm mix asphalt
    August 26, 2021
    The company in charge of maintaining England’s strategic highways, including motorways and main roads, is officially shifting its preference towards using warm mix asphalt. Highways England lays out the case for its decision.*
  • Bitumen tech: innovation for decarbonisation
    June 4, 2024
    Kristina Smith examines four new products and processes, including bio-bitumen produced from algae, designed to lower the carbon footprint of asphalt mixes.