Skip to main content

Height of success

In Romania two thrill seekers climbed a crumbling industrial chimney some 256m high and filmed themselves riding around the top on a unicycle. To reach the top they had to negotiate rusted walkways and ladders that were missing some sections. Once at the top the two pranksters amused themselves riding round and around the chimney, hopping over obstacles and seemed to take great delight in doing so, despite loose brickwork. Remarkably they survived to upload their footage to Youtube.
January 27, 2017 Read time: 1 min
In Romania two thrill seekers climbed a crumbling industrial chimney some 256m high and filmed themselves riding around the top on a unicycle. To reach the top they had to negotiate rusted walkways and ladders that were missing some sections. Once at the top the two pranksters amused themselves riding round and around the chimney, hopping over obstacles and seemed to take great delight in doing so, despite loose brickwork. Remarkably they survived to upload their footage to Youtube.

Related Content

  • Not gone in 60 seconds
    June 10, 2019
    Our Skidmarks page is highly rated by readers. Your input could help make this page even more entertaining. If you come across any amusing road-related stories or pictures email me at [email protected] NOT GONE IN 60 SECONDS A bungling young car thief in Norway found one vehicle too tempting, and also too difficult for his (lack of) skills. The man managed to break into a Volvo saloon but then discovered to his horror that not only was he unable to start it, he was also unable to get out of it. The car
  • Plain sailing for Caterpillar’s PM 300 series
    February 22, 2019
    Caterpillar’s revamped small cold planers have upped the stakes in the urban refurbishing market. World Highways deputy editor David Arminas recently caught up with A.J. Lee, global segment manager, on Spain’s Costa del Sol
  • Making the U-turn
    August 2, 2012
    Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project writes Adrian Greeman Cars, trucks and vans were taking to the new EastLink toll road in Melbourne with enthusiasm this July, pleased to try out its 39km route for time and cost savings. As well as the convenience of the uncongested route, drivers were also able to view an extraordinary multi-shaded perspective of transparent green and orange noise wall panels, burnt earth-coloured retai
  • Tunnelling challenge on German project
    June 13, 2012
    A massive construction project has been underway deep in the heart of the Schnecktal valley area in Germany. From the surface, though, you would never be able to tell. The majority of the work is underground, as a joint-venture team led by German contractor Wayss and Freytag Ingenieurbau builds the nearly 7km long Finne Tunnel. After a few years of tunnel boring operations, the contractor is at work finishing the interior of the tunnel, slipforming first the tunnel’s floor and then a walkway with its GOMACO