Skip to main content

Heavy haulage in Mexico

Mexican heavy haulage specialist Tradelossa, headquartered in Durango, is celebrating its 45th anniversary The company says that it offers solutions for the heavy haul and abnormal load transportation industry and handles national and international logistics operations in North and South America. For many years the company has been purchasing specialist heavy haulage equipment from the German firm, Goldhofer. The Tradelossa fleet includes various types of heavy-duty modules and an extensive selection o
August 15, 2018 Read time: 2 mins
Mexican heavy haulage specialist Tradelossa has ordered a new specialist transport unit from supplier Goldhofer
Mexican heavy haulage specialist Tradelossa, headquartered in Durango, is celebrating its 45th anniversary


The company says that it offers solutions for the heavy haul and abnormal load transportation industry and handles national and international logistics operations in North and South America.

For many years the company has been purchasing specialist heavy haulage equipment from the German firm, 1449 Goldhofer. The Tradelossa fleet includes various types of heavy-duty modules and an extensive selection of special equipment – including an older high girder bridge – supplied by the firm, which is based in the city of Memmingen.

The two companies have a joint anniversary to celebrate. Rafael de los Santos, managing director at Tradelossa explained, "Tradelossa was the first Mexican company to purchase and operate Goldhofer equipment. This year marks the 20th anniversary of a trustful relationship between the two companies."

As an addition to its existing fleet of over 150 Goldhofer axle lines, Tradelossa has now ordered a Faktor 5 high girder bridge, christened Doña Pilar, in memory of the company's co-founder. It is being shipped to Mexico in April 2018. The designation, Faktor 5, is a reference to the impressive payload to deadweight ratio of 5:1; the 100tonne bridge makes light work of cargo weighing up to 500tonnes. The robust design means it is also suitable for use in challenging settings. In addition, the design has a focus on modularity, which gives the unit the versatility to handle a wide range of transport operations. Flexible adjustment of length and width means the high girder bridge can take loads that are 3 – 6.75m wide and 11 – 17m long.

Tradelossa has acquired this unit to increase its transport capacities so as to cope with continually increasing demand for its services and avoid bottlenecks by operating its two high girder bridges simultaneously.

For more information on companies in this article

Related Content

  • Producing high quality stone in Italy
    June 24, 2014
    Botticino marble is one of Italy’s outstanding resources and renowned worldwide. The history of the use of this precious stone, formed between 190 and 60 million years ago, began with the Romans in the mountains east of Brescia. It is between these mountains in the municipality of Botticino Mattina, where the Valverde Cooperative is located. The Cooperative comprises 36 partners specialising in the sector of production, extraction and transformation of Botticino Classico Marble. The Valverde Cooperative
  • Higher production from all-wheel-drive haulers
    August 2, 2012
    The improvements to articulated dump trucks (ADTs) have been substantial in recent years. Comparing a present day machine with one from 20 or even just 10 years ago shows how far design has come. Major improvements have been made in visibility, operator comfort levels, rough terrain performance, driveline efficiency and productivity, to name but a few key areas. All of the latest generation ADTs available on the world market now come with Tier 3/Stage IIIA compliant diesels that produce far lower noise and
  • Cost-saving benefits of dual layer asphalt paving
    February 14, 2012
    Sophisticated dual layer paving technologies currently on the market are said to offer major advantages to road builders. Roads built using twin layer, hot on hot paving techniques can last considerably longer than those constructed using conventional methods. Contractors and clients also stand to gain from savings on materials costs, through the elimination of the need for emulsion spraying between binder and wearing courses and with the use of thin layer wearing course designs. At present two paver man
  • PERI's tall order in Mexico
    February 14, 2012
    The Baluarte Bridge (Puente Baluarte), part of a major highway project, ranks among the most outstanding infrastructure projects ever constructed in Mexico.