Skip to main content

Heavy haulage in Mexico

Mexican heavy haulage specialist Tradelossa, headquartered in Durango, is celebrating its 45th anniversary The company says that it offers solutions for the heavy haul and abnormal load transportation industry and handles national and international logistics operations in North and South America. For many years the company has been purchasing specialist heavy haulage equipment from the German firm, Goldhofer. The Tradelossa fleet includes various types of heavy-duty modules and an extensive selection o
August 15, 2018 Read time: 2 mins
Mexican heavy haulage specialist Tradelossa has ordered a new specialist transport unit from supplier Goldhofer
Mexican heavy haulage specialist Tradelossa, headquartered in Durango, is celebrating its 45th anniversary


The company says that it offers solutions for the heavy haul and abnormal load transportation industry and handles national and international logistics operations in North and South America.

For many years the company has been purchasing specialist heavy haulage equipment from the German firm, 1449 Goldhofer. The Tradelossa fleet includes various types of heavy-duty modules and an extensive selection of special equipment – including an older high girder bridge – supplied by the firm, which is based in the city of Memmingen.

The two companies have a joint anniversary to celebrate. Rafael de los Santos, managing director at Tradelossa explained, "Tradelossa was the first Mexican company to purchase and operate Goldhofer equipment. This year marks the 20th anniversary of a trustful relationship between the two companies."

As an addition to its existing fleet of over 150 Goldhofer axle lines, Tradelossa has now ordered a Faktor 5 high girder bridge, christened Doña Pilar, in memory of the company's co-founder. It is being shipped to Mexico in April 2018. The designation, Faktor 5, is a reference to the impressive payload to deadweight ratio of 5:1; the 100tonne bridge makes light work of cargo weighing up to 500tonnes. The robust design means it is also suitable for use in challenging settings. In addition, the design has a focus on modularity, which gives the unit the versatility to handle a wide range of transport operations. Flexible adjustment of length and width means the high girder bridge can take loads that are 3 – 6.75m wide and 11 – 17m long.

Tradelossa has acquired this unit to increase its transport capacities so as to cope with continually increasing demand for its services and avoid bottlenecks by operating its two high girder bridges simultaneously.

For more information on companies in this article

Related Content

  • Driving ahead with tunnelling developments
    June 13, 2012
    New technologies are coming to market with regard to driving and supporting tunnels, with drilling and blasting and accompanying shotcreating technologies being widely used worldwide. Drilling and blasting can be a cost-effective method in the right conditions and in this segment Atlas Copco and Sandvik hold major market shares worldwide, although other firms such as Furukawa and Montabert also compete. Shotcreting equipment is widely used following after drilling and blasting, with CIFA broadening its rang
  • EmulBitume launches pothole-specific storable cold mix mini plant
    May 19, 2015
    Bitumen plant manufacturer EmulBitume unveiled at the major Pavement Preservation and Recycling Summit (PPRS) in Paris the company’s first storable cold mix-mini plant specifically for pothole repair work. The semi-automated plant has been designed for small batches suitable for efficient pothole maintenance, making the plant an important product for today’s asset management companies, said EmulBitume. EmulBitume’s mini-plant eliminates the cost of handling large quantities of cold mix in bags becaus
  • Three Case loaders unveiled
    February 13, 2012
    Case Construction Equipment introduces three new F Series wheel loaders to European customers, which are said to offer faster acceleration, reduced cycle times, higher travel speeds, increased productivity and up to a 10% reduction in fuel consumption.
  • Underground routes for highways
    July 20, 2012
    Increasingly, and where possible, roads are being built in tunnels often for environmental reasons, writes Patrick Smith As part of the new M7 motorway development in the southwest of Ireland, the four-lane route crosses the River Shannon near Limerick, before it flows into the Atlantic. Centrepiece of the 10km long Limerick Southern Ring Road is the required tunnelling (675m long), which including the north and south entrance and exit ramps, means it will be 915m long. Completion of the work is planned for