Skip to main content

Heavy haulage in Mexico

Mexican heavy haulage specialist Tradelossa, headquartered in Durango, is celebrating its 45th anniversary The company says that it offers solutions for the heavy haul and abnormal load transportation industry and handles national and international logistics operations in North and South America. For many years the company has been purchasing specialist heavy haulage equipment from the German firm, Goldhofer. The Tradelossa fleet includes various types of heavy-duty modules and an extensive selection o
August 15, 2018 Read time: 2 mins
Mexican heavy haulage specialist Tradelossa has ordered a new specialist transport unit from supplier Goldhofer
Mexican heavy haulage specialist Tradelossa, headquartered in Durango, is celebrating its 45th anniversary


The company says that it offers solutions for the heavy haul and abnormal load transportation industry and handles national and international logistics operations in North and South America.

For many years the company has been purchasing specialist heavy haulage equipment from the German firm, 1449 Goldhofer. The Tradelossa fleet includes various types of heavy-duty modules and an extensive selection of special equipment – including an older high girder bridge – supplied by the firm, which is based in the city of Memmingen.

The two companies have a joint anniversary to celebrate. Rafael de los Santos, managing director at Tradelossa explained, "Tradelossa was the first Mexican company to purchase and operate Goldhofer equipment. This year marks the 20th anniversary of a trustful relationship between the two companies."

As an addition to its existing fleet of over 150 Goldhofer axle lines, Tradelossa has now ordered a Faktor 5 high girder bridge, christened Doña Pilar, in memory of the company's co-founder. It is being shipped to Mexico in April 2018. The designation, Faktor 5, is a reference to the impressive payload to deadweight ratio of 5:1; the 100tonne bridge makes light work of cargo weighing up to 500tonnes. The robust design means it is also suitable for use in challenging settings. In addition, the design has a focus on modularity, which gives the unit the versatility to handle a wide range of transport operations. Flexible adjustment of length and width means the high girder bridge can take loads that are 3 – 6.75m wide and 11 – 17m long.

Tradelossa has acquired this unit to increase its transport capacities so as to cope with continually increasing demand for its services and avoid bottlenecks by operating its two high girder bridges simultaneously.

For more information on companies in this article

Related Content

  • Mexico viaduct complete with ULMA formwork
    February 9, 2018
    ULMA developed a comprehensive solution for the construction project of the Interlomas Viaduct, México. Forming part of Mexico City’s transportation infrastructure development plan, this viaduct is 227m long and connects the residential and commercial area Interlomas with the Naucalpan-Toluca highway. ULMA designed a solution fully tailored to meet the pace and needs of the client: gantry falsework for two 59m outer spans, and a CVS Form Carrier for the central span of 108m. ULMA’s engineering team combi
  • Crane assembly for Tibet excavator
    February 9, 2017
    A tough machine assembly operation at extreme altitude has been carried out by two cranes from XCMG The cranes were used to assist in the assembly of a large excavator needed to assist in production at an extraction operation in Tibet. Located at an altitude of no less than 5,400m on the very remote Mila Mountain, the extraction sites was aiming at upgrading its operations and boosting productivity with the addition of a new 100tonne class excavator. The two cranes, an XCT100 model and a QAY300A machi
  • Bridges in Sunderland and Poland are being slid into place
    February 6, 2017
    Sunderland sees a bridge slide into place and two bridges inch their way across a Polish highway Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation likely to take place next year. The project to build the New Wear Crossing is now halfway through with the first half of the steel deck b
  • Pūhoi-to-Warkworth motorway project
    September 25, 2020
    After a hiatus because of the COVID-19 lockdown, work has restarted on what will be one of New Zealand’s most visually impressive motorways. Andrew Thackwray, senior manager for project delivery for Waka Kotahi, the New Zealand Transport Agency, explains