Skip to main content

Heatec’s new mill allows adjustments on the hoof

Heatec’s new emulsion mill skid is on display at Conexpo. The skid, designed to produce 54tonnes of emulsified asphalt per hour, includes an asphalt meter system, a latex pump, a control panel, and the new Barracuda colloid mill. In designing the Barracuda mill, engineers from Heatec examined existing mills to research known drawbacks and see how they could be overcome. One of the features of the mill is the ability to make adjustments while the mill is running. Changing the gap between the jaws is a qu
March 7, 2014 Read time: 1 min
Heatec’s new emulsion mill skid
1251 Heatec’s new emulsion mill skid is on display at Conexpo. The skid, designed to produce 54tonnes of emulsified asphalt per hour, includes an asphalt meter system, a latex pump, a control panel, and the new Barracuda colloid mill.

In designing the Barracuda mill, engineers from Heatec examined existing mills to research known drawbacks and see how they could be overcome. One of the features of the mill is the ability to make adjustments while the mill is running. Changing the gap between the jaws is a quick and easy operation, according to Heatec.

The mill has gone through extensive testing at an emulsion production facility in Oklahoma City, owned by Vance Brothers.










%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 44677 0 oLinkExternal www.Heatec.com Heatec web false /EasySiteWeb/GatewayLink.aspx?alId=44677 false false%>

For more information on companies in this article

Related Content

  • Putzmeister adds five-section pump
    January 6, 2017
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Putzmeister adds five-section pump
    April 19, 2013
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Soilmec shows SC-70 and SC-90 hydraulic crawler cranes
    January 6, 2017
    Models brought to bauma by Soilmec included two new multipurpose hydraulic crawler cranes for heavy-duty applications. Among key features of the SC-70 and SC-90 is a design that enables easy transport and set-up on site. The cranes are modular for fast conversion between a range of applications, such as use with a hydraulic or mechanical grab, hydromill, chisel, vibratory driver or clamshell. New Tier 4 engines are available.
  • Soilmec shows SC-70 and SC-90 hydraulic crawler cranes
    April 19, 2013
    Models brought to bauma by Soilmec included two new multipurpose hydraulic crawler cranes for heavy-duty applications. Among key features of the SC-70 and SC-90 is a design that enables easy transport and set-up on site. The cranes are modular for fast conversion between a range of applications, such as use with a hydraulic or mechanical grab, hydromill, chisel, vibratory driver or clamshell. New Tier 4 engines are available.