Skip to main content

Heatec’s new mill allows adjustments on the hoof

Heatec’s new emulsion mill skid is on display at Conexpo. The skid, designed to produce 54tonnes of emulsified asphalt per hour, includes an asphalt meter system, a latex pump, a control panel, and the new Barracuda colloid mill. In designing the Barracuda mill, engineers from Heatec examined existing mills to research known drawbacks and see how they could be overcome. One of the features of the mill is the ability to make adjustments while the mill is running. Changing the gap between the jaws is a qu
January 6, 2017 Read time: 1 min
Heatec’s new emulsion mill skid
1251 Heatec’s new emulsion mill skid is on display at Conexpo. The skid, designed to produce 54tonnes of emulsified asphalt per hour, includes an asphalt meter system, a latex pump, a control panel, and the new Barracuda colloid mill.

In designing the Barracuda mill, engineers from Heatec examined existing mills to research known drawbacks and see how they could be overcome. One of the features of the mill is the ability to make adjustments while the mill is running. Changing the gap between the jaws is a quick and easy operation, according to Heatec.

The mill has gone through extensive testing at an emulsion production facility in Oklahoma City, owned by Vance Brothers.
%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 44677 0 oLinkExternal www.Heatec.com Heatec web false /EasySiteWeb/GatewayLink.aspx?alId=44677 false false%>

For more information on companies in this article

Related Content

  • CDE’s new German focus
    February 13, 2013
    CDE Global has formed CDE GmbH trading as CDE Deutschland, which has developed from a distribution agreement for southern Germany that was in place between CDE Global and Jurgen Kolsch. The move sees Stefan Kolsch and Sean McCusker assume roles as directors in the new company, which will have exclusive responsibility for the sales, distribution, project management and after sales and service elements of the CDE business in Germany.
  • XCMG to create R&D base in the United States
    January 6, 2017
    Leading Chinese construction equipment manufacturing firm XCMG has revealed plans to open a new research and development facility in the United States. Speaking at bauma 2013 Wang Yansong, the company’s vice president, said, “In the second half of this year we are planning to build a R&D centre in the United States. It’ll take about half a year to finish construction. It should open in 2014.” While Yansong would not reveal how much XCMG was investing in the US site, he said it was due to America, along with
  • XCMG to create R&D base in the United States
    April 16, 2013
    Leading Chinese construction equipment manufacturing firm XCMG has revealed plans to open a new research and development facility in the United States. Speaking at bauma 2013 Wang Yansong, the company’s vice president, said, “In the second half of this year we are planning to build a R&D centre in the United States. It’ll take about half a year to finish construction. It should open in 2014.” While Yansong would not reveal how much XCMG was investing in the US site, he said it was due to America, along with
  • Loadrite introduces its 360° load-out management system
    April 18, 2013
    The new Loadrite 360° management system has been designed to boost efficiency in quarries by integrating communication across all stages of an order for faster turnarounds and maximised payloads. Loadrite said that the system improves communication throughout the load-out operations. It is aimed at providing quarry managers with the tools they need to get the most from both staff and equipment. Benefits include lower costs per tonne and optimised truck utilisation, said the company.