Skip to main content

Heatec’s new mill allows adjustments on the hoof

Heatec’s new emulsion mill skid is on display at Conexpo. The skid, designed to produce 54tonnes of emulsified asphalt per hour, includes an asphalt meter system, a latex pump, a control panel, and the new Barracuda colloid mill. In designing the Barracuda mill, engineers from Heatec examined existing mills to research known drawbacks and see how they could be overcome. One of the features of the mill is the ability to make adjustments while the mill is running. Changing the gap between the jaws is a qu
January 6, 2017 Read time: 1 min
Heatec’s new emulsion mill skid
1251 Heatec’s new emulsion mill skid is on display at Conexpo. The skid, designed to produce 54tonnes of emulsified asphalt per hour, includes an asphalt meter system, a latex pump, a control panel, and the new Barracuda colloid mill.

In designing the Barracuda mill, engineers from Heatec examined existing mills to research known drawbacks and see how they could be overcome. One of the features of the mill is the ability to make adjustments while the mill is running. Changing the gap between the jaws is a quick and easy operation, according to Heatec.

The mill has gone through extensive testing at an emulsion production facility in Oklahoma City, owned by Vance Brothers.
%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 44677 0 oLinkExternal www.Heatec.com Heatec web false /EasySiteWeb/GatewayLink.aspx?alId=44677 false false%>

For more information on companies in this article

Related Content

  • Benninghoven reveals recycling innovation
    January 6, 2017
    Benninghoven has a rich history of innovation in asphalt plant technology. Speaking at bauma 2013, the German company’s managing director Bernd Benninghoven said the firm had developed and were trialling a new system for recycling. “In order to save valuable resources we have developed a special machine that can handle big lumps of recycling material which then separates it back into its own original structure,” he explained. “This then allows you to add as much recycling as possible which is important.
  • Benninghoven reveals recycling innovation
    April 30, 2013
    Benninghoven has a rich history of innovation in asphalt plant technology. Speaking at bauma 2013, the German company’s managing director Bernd Benninghoven said the firm had developed and were trialling a new system for recycling. “In order to save valuable resources we have developed a special machine that can handle big lumps of recycling material which then separates it back into its own original structure,” he explained. “This then allows you to add as much recycling as possible which is important.
  • New Allu 3D positioning system for mass stabilisation
    January 6, 2017
    The new Allu 3D positioning system at CONEXPO is made up of four modules: computer unit with software; touch-screen; base station and GPS antennas utilising GPS signals.
  • New Allu 3D positioning system for mass stabilisation
    January 28, 2014
    The new Allu 3D positioning system at CONEXPO is made up of four modules: computer unit with software; touch-screen; base station and GPS antennas utilising GPS signals.