Skip to main content

Heald’s new HT-1 Mantis static bollard

Offering high security combined with a rapid, low cost installation the new shallow mount HT-1 Mantis static bollard from Heald is said to be a viable alternative to deep mount static bollards. The Mantis is available with a range of stylish stainless steel covers, finished in a variety of colours to suit any location.
May 19, 2014 Read time: 2 mins
Heald’s HT1-Mantis during crash testing
Offering high security combined with a rapid, low cost installation the new shallow mount HT-1 Mantis static bollard from 5976 Heald is said to be a viable alternative to deep mount static bollards. The Mantis is available with a range of stylish stainless steel covers, finished in a variety of colours to suit any location.
 
The Mantis offers a static solution with a true excavation depth of only 250mm. No pre-casting of the pit is required, nor is any additional rebar. Heald’s fitters can excavate the pit, place the Mantis and infill with just over 0.5m³ of concrete in less than an hour.

Furthermore, as the Mantis was tested as a standalone bollard it can be installed individually or as part of an array to secure an aperture of virtually any width.

Heald recently tested the Mantis at MIRA's testing grounds in central England, where it is said to have received a rating of PAS68:2013 Fixed Bollard V/7500(N2)/64/90:0.0/0.0. This means that the Mantis will arrest a 7.5tonne truck from a speed of 64kph with zero penetration and zero dispersion. In the impact the structure of the bollard remained intact, ensuring continued protection against further attack.

Equally important is the simplicity of the Mantis's installation process. Requiring an excavation measuring only 1800mm wide x 1800mm long x 250mm deep, it is perfect for situations in which a traditional deep mount bollard is impractical or impossible - for example locations with underlying cables or ducting - but where high levels of security are essential.
Heald

For more information on companies in this article

Related Content

  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Brisbane's highway of distinction
    August 2, 2012
    A massive AU$2 billion update of the Gateway Motorway in Queensland is underway to improve an infrastructure stretched by population boom. Report and photographs by Adrian Greeman Just 20 years after the Australian city of Brisbane built its Gateway Motorway with a high slim signature bridge dominating the river skyline, the road is being completely revamped. Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels; the north is getting a completely
  • Compact paving solution from Ammann
    February 3, 2021
    Ammann’s compact paver has proven its worth for a German contractor
  • Soil compaction innovations being introduced
    June 19, 2017
    Major developments in soil compaction are being introduced - Mike Woof writes. With manufacturers keen to meet new regulations and deliver greater performance to customers, an array of new soil compactors are now coming to market. One of the new developments from the Ammann Group is the unveiling of its ASC 110 Tier 3 soil compactor, which is powered by a Cummins QSG 4.5 diesel rated at 119kW and has a 2.13m-wide drum. This machine is designed to meet the needs of emergent markets where high quality fuels w