Skip to main content

Heald’s new HT-1 Mantis static bollard

Offering high security combined with a rapid, low cost installation the new shallow mount HT-1 Mantis static bollard from Heald is said to be a viable alternative to deep mount static bollards. The Mantis is available with a range of stylish stainless steel covers, finished in a variety of colours to suit any location.
May 19, 2014 Read time: 2 mins
Heald’s HT1-Mantis during crash testing
Offering high security combined with a rapid, low cost installation the new shallow mount HT-1 Mantis static bollard from 5976 Heald is said to be a viable alternative to deep mount static bollards. The Mantis is available with a range of stylish stainless steel covers, finished in a variety of colours to suit any location.
 
The Mantis offers a static solution with a true excavation depth of only 250mm. No pre-casting of the pit is required, nor is any additional rebar. Heald’s fitters can excavate the pit, place the Mantis and infill with just over 0.5m³ of concrete in less than an hour.

Furthermore, as the Mantis was tested as a standalone bollard it can be installed individually or as part of an array to secure an aperture of virtually any width.

Heald recently tested the Mantis at MIRA's testing grounds in central England, where it is said to have received a rating of PAS68:2013 Fixed Bollard V/7500(N2)/64/90:0.0/0.0. This means that the Mantis will arrest a 7.5tonne truck from a speed of 64kph with zero penetration and zero dispersion. In the impact the structure of the bollard remained intact, ensuring continued protection against further attack.

Equally important is the simplicity of the Mantis's installation process. Requiring an excavation measuring only 1800mm wide x 1800mm long x 250mm deep, it is perfect for situations in which a traditional deep mount bollard is impractical or impossible - for example locations with underlying cables or ducting - but where high levels of security are essential.
Heald

For more information on companies in this article

Related Content

  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • Developments in bridge monitoring technology
    July 9, 2012
    Advances in bridge monitoring technology should help ensure structural safety Highly productive, Fugro Aperio's ground penetrating radar system offers accurate scanning of bridge condition Bridge engineers can now benefit from a new technology designed to pinpoint shallow targets, such as masonry fixings, reinforcement bars or delamination between thin layers. This uses the latest high resolution ground penetrating radar (GPR) antenna and has been developed by Cambridge-based Fugro Aperio in the UK. Operati
  • Pilosio and CMC Ravenna collaborate on Cornubia Interchange
    June 4, 2019
    The South African branch of the Italian construction company CMC di Ravenna again teamed up with formwork specialist Pilosio to take advantage of Pilosio's solutions. This time it was for construction of a new bridge in the city of Durban, a project named N2/Cornubia Interchange. The overpass will streamline traffic by linking the Umhlanga industrial zone with the Cornubia new development area Tongat. Cornubia is a multibillion rand integrated settlement near Umhlanga, north of Durban, in KwaZulu Natal,
  • Bridge inspection: destructive versus non-destructive methods
    January 6, 2015
    Tens of thousands of bridges in the United States are in desperate need of repair. But where to begin analysing their deteriorating state? Roger Roberts* investigates tips and techniques for ensuring bridge safety The average age of America’s more than 600,000 crumbling bridges is 42 years – many are 60 to 80 years old. The situation is dire, with many described as functionally obsolete, according to the American Society of Civil Engineers’ latest edition of its Report Card for America’s Infrastructure.