Skip to main content

Haver & Boecker makes Hydro-Clean start

Haver & Boecker, a leading equipment manufacturer and solutions provider in aggregates and mining applications, has launched the skid-mounted Hydro-Clean 1000 Wash Plant as a complete solution.
March 9, 2017 Read time: 3 mins
Hydro-Clean 1000 washing plant

7142 Haver & Boecker, a leading equipment manufacturer and solutions provider in aggregates and mining applications, has launched the skid-mounted Hydro-Clean 1000 Wash Plant as a complete solution.

In addition to a Hydro-Clean 1000 washing system combined with a single-deck, linear-stroke Tyler L-Class vibrating rinse screen, H&B now offers semi-portability by mounting the complete system on a custom skid structure. The opportunity to purchase the three components together is said by H&B to save operations months of time they would have spent on designing and building a skid structure for a wash plant. The new package is said to deliver maximum serviceability in a small footprint.

“We’re always looking for ways to solve our customers’ problems and improve their productivity and efficiency,” said Karen Thompson, president of Haver & Boecker Canada. “By offering the Hydro-Clean 1000 Wash Plant, we’re saving producers from spending extensive time on engineering and manufacturing a structure for a wash plant. This gives them an opportunity to focus their time and money on improving profits elsewhere in their operations.”

The Hydro-Clean 1000 system processes as much as 200tonnes/hour of sellable product with its short retention times, using minimal water and power. During the cleaning process, the washed material works its way down the HC1000’s drum and exits onto a discharge conveyor that leads to the L-Class wash screen. The vibrating screen removes any remaining dirt or clay still on the stone as it fractionates the material. H&B engineers drew on their extensive experience to design and build a skid structure perfectly suited for the semi-portable system.

Taking feed material as large as 150mm into its 100cm vertical drum, the Hydro-Clean 1000 employs 2,000psi high-pressure nozzles, rotating at 90rpm, to remove silt and clay particles as small as 63microns from mineral mixtures.

The wash plant’s other major component, the L-Class vibrating screen, uses a double-shaft overhead drive system, with direct-mounted motors, to provide multiple speed and stroke combinations in a compact design. With a horizontal screen, material spends more time on the deck for optimal cleanliness.

The HC1000 Wash Plant includes serviceability features for maximum convenience and safety. H&B manufactures the plant with stairs, eliminating the dangers of carrying parts and tools up ladders. In addition, mechanics can easily use the plant’s catwalks and platforms to reach service points, such as spray nozzles.

Tailor-made wash plants can be made for customers by H&B to create, for example, a model including a different size or type of vibrating screen, more decks or a different Hydro-Clean solution.

For more information on companies in this article

Related Content

  • Bitumen technology: from potholes to PMB plants
    November 21, 2014
    This month we look at how warm mix is helping to pave dirt roads, a new way to tackle potholes, and bring news of a new distribution centre for the UK - Kristina Smith reports The creation of a new mix design, incorporating MWV’s warm mix additive Evotherm, is providing cost-effective solutions for dirt roads in the US’s Charleston County. The first stretch to be paved with the new porous paving in April this year, Joseph White Road in the town of Adams Run, resulted in the estimated US$1.1 million construc
  • Emphasis on the new at record-breaking World of Asphalt 2013 & AGG1
    February 21, 2013
    The 2013 World of Asphalt and AGG1 expositions taking place March 19-21 in San Antonio, Texas are on course to be sold out by opening day, setting new records for exhibitor numbers and attendees. Guy Woodford discovers that major construction industry manufacturers will be highlighting new as well as established machine models in their exhibits at the co-located events Covering more than 10,870m² of exhibit space, attendees at the 2013 World of Asphalt and AGG1 shows can expect to find a huge line-up of new
  • Getech launches new centrifuge for sludge dewatering
    February 26, 2013
    Getech, which says it is among the leaders in the drilling, quarrying and aggregate recycling industries for the water and silt management systems, is introducing its largest model of high performance centrifuge for sludge dewatering in the construction industry. “We have built up extensive knowledge in the last 20 years of processing silts from aggregates, dewatering sludge from the construction of foundations, from quarries, from sand and gravel washing and also recovery of bentonite from weighted mud in
  • UK contractor operating sophisticated Benninghoven asphalt plant
    April 27, 2015
    A sophisticated Benninghoven asphalt plant is now in use by a UK contractor close to London - Mike Woof writes UK contractor FM Conway is now operating a second highly advanced asphalt plant in the London area. As with the first unit supplied a few years ago, the plant was designed and constructed to FM Conway’s specific needs by leading producer Benninghoven. This latest plant is located to the west of London (the earlier plant is to the east of the city) and close to Heathrow Airport. Being situated