Skip to main content

Hammerglass barriers for Förbifart Stockholm

Swedish glazing specialist Hammerglass is supplying around 1,000 transparent sound barrier panels to the Stockholm Bypass – E4 Förbifart Stockholm - project over an 18-month period
November 25, 2021 Read time: 3 mins
The PostFree system in Stockholm is held by a steel plate, or a steel “foot”, embedded into, or bolted onto, the cement curb or a bridge’s superstructure

The Hjulsta part of the bypass consists mainly of bridges and road junctions which makes sound barriers essential for the residential areas.

Hammerglass says that it is the only supplier of what the company calls its PostFree system. The development process was made possible thanks to the company’s 20-years' production of customer-specific unbreakable glazing solutions which includes panels for the cabins of heavy construction machinery.

For the Stockholm Bypass project, the panels have a “bent” side and need no posts for installation. They will be part of a 4km-long wall although some sections will include other sound absorbing materials in accordance with the client’s wishes.

Each sheet is, to the human eye, totally transparent. The company says that people prefer to see through a sound barrier because it then feels less like a physical barrier. It is also not then “hiding” what is going on behind the structure, thereby adding to the viewer’s sense of security.

However, while the screen is transparent to humans, it also comes in three shades of green for a visually pleasing effect. There are also enough internal patterns which are not noticeable to humans but are to birds, meaning they can see the panels and not fly into them.

A Hammerglass sheet is around 1.5m wide and between 2-6m high. Around 50cm of one side is bent, or curved, to a 90° angle. The company also claims that each sheet is unbreakable. The most common sheet thickness for highway use is 12mm. For railroad applications the thickness is usually 15mm. Hammerglass says one of its PostFree panels weighs less than half that of a similarly sized glass sheet. Its lightness makes installation easier and faster than for glass.

A sheet’s effectiveness is measured in by Rw - or a weighted sound reduction index. This is an International Organisation for Standardisation (ISO) rating and part of the ISO 140 (Acoustic) family. The 12mm thickness has an Rw of 34dB, meaning the client can expect the noise it wants to block will be reduced by 34 decibels.

The PostFree system is fixed into position by a steel plate, or a steel “foot”, that is embedded into or bolted onto the cement curb, road section or a bridge’s superstructure. Each panel slightly overlaps the next one to it and is secured using several fixing bolts.

Importantly, the polycarbonate hard-coated surface has a layer of silicon oxide that makes it very easy to clean off graffiti and dirt which helps reduce maintenance costs. As well, a panel provides 99.96 % UV-protection. It will not cloud or discolour or undergo any other change in optical quality over time. The company says that a sheet’s estimated service life is more than 40 years.

Hammerglass has already delivered the unbreakable noise barrier panels for use in other projects by Sweden’s Transport Administration which, in 2018, held a public procurement process for a noise barrier that needed no posts for installation. Hammerglass says it was the only company to take on the challenge and came up with their solution now being used by the Administration.

For more information on companies in this article

Related Content

  • New EU-Russian highway connection
    February 18, 2013
    Among the forests and lakes of Finland, one of Europe's newest motorway links is being built as a Green highway linking Europe to Russia - Adrian Greeman reports The road eastwards from Finland's capital Helsinki, along the north coast of the Gulf of Finland, has not carried heavy traffic volumes, at least until recent times. Highway seven as it is designated locally, or E18 in European nomenclature, is partly motorway but in some sections still dual carriageway or even just a single lane each way, finishin
  • Peri formwork for Danish port link tunnel project
    November 29, 2013
    The Nordhavnsvej – Vej- og Tunnelentreprise (Nordhavnsvej) project is Copenhagen’s largest infrastructure project in the last 50 years. The 1.65km-long route will eventually link the Danish capital’s northern port area with the Helsingør motorway. It runs through a very densely built urban area, in parts at depths of up to 22m. One particular challenge regarding the execution was planning the course of the tunnel because the underground structure also crosses a very busy railway line.
  • 'Quiet' work in Stockholm
    July 24, 2012
    Aquajet's new Ecosilence Power Pack has been tested to its limits on the tunnel/bridge renovation work in the city's historic Old Town and has exceeded all expectations, according to E-Schakt's project supervisor, Andreas Nordstrom. Equipment from the Swedish company, including Ecosilence making its debut, is being used in the tunnel and on the 1.2km Central Bridge (or 'Three Bridges'), which was built in the 1950s and which links the northern district of Norrmalm and the southern district of Södermalm. It
  • Kapsch for Kekava Bypass
    March 6, 2024

    The Ķekava Bypass - Latvia's first "high-speed road" - opened in October and with it a traffic management system from Kapsch TrafficCom started operation.

    The bypass is providing an efficient alternative for motorists travelling between the Latvian capital Riga, on the Baltic Sea, and neighbouring Lithuania to the south. Traffic in the small town of Ķekava is now being reduced.