Skip to main content

Green screens cause drivers to slow down

A high risk collision site on the busy A574 in the UK has been made safer thanks to the installation of environmentally friendly Green Screens. The 1.8m high screens have been installed on the approach to the roundabout at the junction of Birchwood Way and Woolston Grange Avenue and mean that approaching vehicles have to slow down when approaching the roundabout. Warrington Borough Council explained that as the roundabout is large, many motorists approaching from the direction of the M6 motorway do so at s
February 15, 2012 Read time: 2 mins
A high risk collision site on the busy A574 in the UK has been made safer thanks to the installation of environmentally friendly Green Screens. The 1.8m high screens have been installed on the approach to the roundabout at the junction of Birchwood Way and Woolston Grange Avenue and mean that approaching vehicles have to slow down when approaching the roundabout.
Warrington Borough Council explained that as the roundabout is large, many motorists approaching from the direction of the M6 motorway do so at speed because they have a good view and can be over-confident about joining traffic on the roundabout. This has resulted in collisions when motorists have misjudged the manoeuvre and there have been many occasions when vehicles on the approach to the roundabout have had to stop suddenly, causing following vehicles to collide.
The Green Screens feature wire fencing covered with ivy and obstruct the view of the roundabout as motorists approach, encouraging drivers to slow down. This technique provides an effective way of reducing collisions. Warrington Borough Council chose Green Screens over traditional wooden fencing or walling because the products offer environmental benefits and require minimal maintenance.
So far 100 Green Screens have been installed on the A574 approach to the roundabout, with another 40 Screens installed on the B5210 Woolston Grange Avenue approach.

Related Content

  • Indian quarry boosts wear life and output
    June 20, 2016
    An Indian quarry facility has seen increased uptime and gains in overall efficiency due to the installation of new wear components in its crushing system Installing new distributor plates in this Indian granite quarry has increased its plate operational lifetime by 400-500%. Panchami Stone has fitted the unique HX900 plates to the 85 HP rotor of its Sandvik Construction CV218 VSI, reducing its replacement costs by 50%. The Panchami Stone granite quarry is located 60km from Bangalore, in the south of I
  • SWARCO prism signs for Highways England
    September 8, 2020
    The deal is part of a phased scheme of a diversion routes over the next few years.
  • Use 3D modelling to advance sustainable highway construction best practices
    April 30, 2025
    When it comes to advancing highway sustainability, the role of 3D modeling and digital technologies in road construction is becoming ever-more important. Anna Liza Montenegro, director of marketing at Microsol Resources explains why your business needs to get involved now.
  • Simex levers big green gains
    July 7, 2023
    Innovative asphalt recycling and road maintenance solutions from Simex draw on the levers of savings, innovation and environmental sustainability.