Skip to main content

Goldhofer to a Faktor of 5

Goldhofer has launched its new Faktor 5 high girder bridges. The bridges, said by the German firm to allow the transport of up to five times their own weight, come in various models with deadweights ranging from 70 to 130tonnes, making it possible to transport payloads ranging from 350 to 650tonnes. Said by Goldhofer to be comfortable with transporting extremely heavy loads such as transformers, generators, or other heavy industrial components, the new high girder bridges have a vertical stroke in the loadi
January 3, 2013 Read time: 2 mins

Goldhofer has launched its new Faktor 5 high girder bridges.

The bridges, said by the German firm to allow the transport of up to five times their own weight, come in various models with deadweights ranging from 70 to 130tonnes, making it possible to transport payloads ranging from 350 to 650tonnes.
 
Said by 1449 Goldhofer to be comfortable with transporting extremely heavy loads such as transformers, generators, or other heavy industrial components, the new high girder bridges have a vertical stroke in the loading area of 1.8m, and progressively-adjustable loading widths ranging from 3m-6.75m. These measurements make the high girder bridges flexible, with an ease of adjustment guaranteeing the greatest comfort.

Due to claimed possible loading lengths of 11m to above 17m, as well as an extremely variable axle configuration (from 2m x 12m up to 2m x 20m), Goldhofer said there are to be “practically no limits” to the transport of large, heavy loads.  Furthermore, the high girder bridges with Faktor 5 are able to guarantee easy mobilisation and economical shipping in containers.

The innovative and technically mature high girder bridges, the lateral stabilisation system from Goldhofer, the reliable hydraulics system with pressures up to 250bar, and the intelligent cross-bracing system are all said to provide the greatest possible safety during transport and the maximum protection of precious loads.

Unveiling the Faktor 5 high girder bridges, Goldhofer chief executive Stefan Fuchs said: “With the new high girder bridge Faktor 5, we have created a highly technological and innovative product that further solidifies Goldhofer’s position as the international leader in heavy transport.”

For more information on companies in this article

Related Content

  • Wirtgen is increasing its concrete paving range
    January 6, 2017
    Wirtgen continues to develop its slipformer line-up with the addition of three new SP80 series models, each of which is built along modular lines and available in two versions. These machines are the SP81 and SP81i, the SP82 and SP82i and Sp84 and SP84i and are said to be designed to suit a wide range of applications, offering high-precision paving and ease of use.
  • Wirtgen is increasing its concrete paving range
    February 4, 2013
    Wirtgen continues to develop its slipformer line-up with the addition of three new SP80 series models, each of which is built along modular lines and available in two versions. These machines are the SP81 and SP81i, the SP82 and SP82i and Sp84 and SP84i and are said to be designed to suit a wide range of applications, offering high-precision paving and ease of use.
  • Further new European pavers were launched at bauma 2013
    May 30, 2013
    Earlier this year several manufacturers announced new European asphalt pavers being launched at bauma 2013, but more surprises were in store at the show - Mike Woof writes. At the beginning of 2013 a number of manufacturers revealed new asphalt pavers being launched at the bauma 2013 exhibition. BOMAG, Caterpillar, Vögele and Volvo CE all announced new asphalt pavers in the shape of the BF900, AP300D, -3 Series units and new wheeled P-6870C respectively. These machines were at the show and all attracted con
  • Asphalt paving review for 2019
    February 12, 2020
    A series of new asphalt pavers have been introduced in 2019