Skip to main content

Goldhofer to a Faktor of 5

Goldhofer has launched its new Faktor 5 high girder bridges. The bridges, said by the German firm to allow the transport of up to five times their own weight, come in various models with deadweights ranging from 70 to 130tonnes, making it possible to transport payloads ranging from 350 to 650tonnes. Said by Goldhofer to be comfortable with transporting extremely heavy loads such as transformers, generators, or other heavy industrial components, the new high girder bridges have a vertical stroke in the loadi
January 3, 2013 Read time: 2 mins

Goldhofer has launched its new Faktor 5 high girder bridges.

The bridges, said by the German firm to allow the transport of up to five times their own weight, come in various models with deadweights ranging from 70 to 130tonnes, making it possible to transport payloads ranging from 350 to 650tonnes.
 
Said by 1449 Goldhofer to be comfortable with transporting extremely heavy loads such as transformers, generators, or other heavy industrial components, the new high girder bridges have a vertical stroke in the loading area of 1.8m, and progressively-adjustable loading widths ranging from 3m-6.75m. These measurements make the high girder bridges flexible, with an ease of adjustment guaranteeing the greatest comfort.

Due to claimed possible loading lengths of 11m to above 17m, as well as an extremely variable axle configuration (from 2m x 12m up to 2m x 20m), Goldhofer said there are to be “practically no limits” to the transport of large, heavy loads.  Furthermore, the high girder bridges with Faktor 5 are able to guarantee easy mobilisation and economical shipping in containers.

The innovative and technically mature high girder bridges, the lateral stabilisation system from Goldhofer, the reliable hydraulics system with pressures up to 250bar, and the intelligent cross-bracing system are all said to provide the greatest possible safety during transport and the maximum protection of precious loads.

Unveiling the Faktor 5 high girder bridges, Goldhofer chief executive Stefan Fuchs said: “With the new high girder bridge Faktor 5, we have created a highly technological and innovative product that further solidifies Goldhofer’s position as the international leader in heavy transport.”

For more information on companies in this article

Related Content

  • Formwork plays a leading role in global infrastructure projects
    June 13, 2012
    New and highly regarded existing formwork systems have been used in major recent transport-related construction projects across the globe. Guy Woodford looks at some of their applications The multi-million dollar Mississippi River Bridge project in the United State is creating a vital new gateway between Illinois and Missouri. Central to the project is the realignment and reconstruction of Interstate 70 and a new landmark bridge, featuring two pylons projecting vertically from the Mississippi river bed w
  • Gold star for Goldhofer’s STZ-VP (285) loader semi-trailer
    April 17, 2018
    The latest addition to Goldhofer’s STZ-VP family is the “big boy”, whose 285mm tyres makes it the company’s loader semi-trailer with the highest load-carrying capacity. It has proven pendular axle technology available in configurations between three and 10 axles as well as a choice of decks - vessel bridge, crawler deck and flatbed. It also has a technically permissible axle load of around 15.5tonnes and a deck profile of only 200mm for the flatbed, putting it slimmest on the market, according to Goldhofer
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.