Skip to main content

Goldhofer to a Faktor of 5

Goldhofer has launched its new Faktor 5 high girder bridges. The bridges, said by the German firm to allow the transport of up to five times their own weight, come in various models with deadweights ranging from 70 to 130tonnes, making it possible to transport payloads ranging from 350 to 650tonnes. Said by Goldhofer to be comfortable with transporting extremely heavy loads such as transformers, generators, or other heavy industrial components, the new high girder bridges have a vertical stroke in the loadi
January 3, 2013 Read time: 2 mins

Goldhofer has launched its new Faktor 5 high girder bridges.

The bridges, said by the German firm to allow the transport of up to five times their own weight, come in various models with deadweights ranging from 70 to 130tonnes, making it possible to transport payloads ranging from 350 to 650tonnes.
 
Said by 1449 Goldhofer to be comfortable with transporting extremely heavy loads such as transformers, generators, or other heavy industrial components, the new high girder bridges have a vertical stroke in the loading area of 1.8m, and progressively-adjustable loading widths ranging from 3m-6.75m. These measurements make the high girder bridges flexible, with an ease of adjustment guaranteeing the greatest comfort.

Due to claimed possible loading lengths of 11m to above 17m, as well as an extremely variable axle configuration (from 2m x 12m up to 2m x 20m), Goldhofer said there are to be “practically no limits” to the transport of large, heavy loads.  Furthermore, the high girder bridges with Faktor 5 are able to guarantee easy mobilisation and economical shipping in containers.

The innovative and technically mature high girder bridges, the lateral stabilisation system from Goldhofer, the reliable hydraulics system with pressures up to 250bar, and the intelligent cross-bracing system are all said to provide the greatest possible safety during transport and the maximum protection of precious loads.

Unveiling the Faktor 5 high girder bridges, Goldhofer chief executive Stefan Fuchs said: “With the new high girder bridge Faktor 5, we have created a highly technological and innovative product that further solidifies Goldhofer’s position as the international leader in heavy transport.”

For more information on companies in this article

Related Content

  • Aggregate machinery makers raise the efficiency bar
    May 22, 2018
    Manufacturers of crushers and screens are making their equipment more efficient as well as quieter. Among new entrants into the jaw crusher market is the MC 120 Pro, from Writgen company Kleemann. It was launched last September at the industry trade fair in Homberg/Nieder-Ofleiden, Germany. Both the diesel-electric jaw crusher – operating as part of an interlinked machine combination additionally comprising the MCO 11 PRO cone crusher and MS 953 EVO screening plant – and the MBRG 2000 granulator showed off
  • Advancing asphalt plant technology
    June 9, 2016
    Advances in asphalt plant technology were in major evidence at the bauma 2016 exhibition in Munich - Mike Woof writes One of the most apparent developments at bauma 2016 was the strong focus on asphalt plant technology. The massive physical presence of the asphalt plants could be seen from a distance, right across the showground, particularly the 50m-high machine Benninghoven had opted to exhibit. However, other plant systems from rival firms Ammann, Lintec and Marini, as well as Turkish company E-MAK, c
  • Peri raises its game with hydraulic cylinder for UP Rosett props
    February 3, 2015
    Peri is highlighting several of its premier products this year, including the company’s panel wall formwork Maximo, its Gridflex grid slab formwork and the Peri UP Rosett Flex props. Intermat also marks the introduction of Maximo into the French market. The product makes the best use of manpower when on-site manpower is at a premium. The one-sided tie installation by only one person reduces the time needed to set up the formwork. Ties are installed from one side without spacer tubes and there is reduced
  • Peri raises its game with hydraulic cylinder for UP Rosett props
    January 6, 2017
    Peri is highlighting several of its premier products this year, including the company’s panel wall formwork Maximo, its Gridflex grid slab formwork and the Peri UP Rosett Flex props. Intermat also marks the introduction of Maximo into the French market. The product makes the best use of manpower when on-site manpower is at a premium. The one-sided tie installation by only one person reduces the time needed to set up the formwork. Ties are installed from one side without spacer tubes and there is reduced