Skip to main content

Go with the flow with TrafFix Devices' Water Wall

TrafFix Devices says that its Water Wall barrier, made from durable low-density polyethylene plastic, is ideal for longevity and resistant to cracks and breakage.
By David Arminas April 15, 2025 Read time: 2 mins
A steel connection and keeper pin system ensures secure interlocking between sections, while molded-in forklift and pallet jack slots allow for easy transport and positioning

TrafFix Devices, a US global manufacturer and supplier of traffic control devices and crash attenuators, is offering the Water Wall, a temporary safety delineator.

The Water Wall is a MASH-eligible TL-2 longitudinal channelising device that provides critical protection in work zones by clearly delineating spaces while maintaining optimal visibility for drivers. Its 812mm (32-inch) tall by 1,829mm (72-inch) long low-profile ensures clear sightlines at intersections which improves traffic awareness and reduces accident risks.

TrafFix Devices says that the Water Wall is manufactured from durable low-density polyethylene plastic which makes is it built for longevity and resistant to cracks and breakage, even in demanding conditions. Its double-wall knuckle design reinforces hinge points, reducing the risk of structural failure. The hinge allows up to 30 degrees of pivoting.

Meanwhile, the positive separation system can be adjusted to fit various layouts, while a new corner piece enables 90-degree turns for even greater versatility.

The Water Wall includes a 203mm (8-inch) fill hole with a twist-lock plastic cap for a faster filling process and a tamper-resistant offset drain plug that secures or releases in just two-and-a-half turns. A steel connection and keeper pin system ensures secure interlocking between sections, while molded-in forklift and pallet jack slots allow for easy transport and positioning.

For added security, the Water Wall is compatible with the company’s Water-Wall chain-link fence attachment, providing an additional layer of protection when necessary.

Designed to meet rigorous safety standards, the Water Wall has been NCHRP-350 tested and passed to MASH (Manual for Assessing Safety Hardware) TL-1 Barrier Wall, TL-2 Longitudinal Channelising Device and TL-3 Barricade.

It also seamlessly connects to the SLED end treatment, eliminating the need for additional shielding or flaring, further simplifying deployment. SLED is the ‘sentry longitudinal energy dissipater’, a narrow water-filled non-redirective gating crash cushion that is a MASH tested, passed and eligible.

TrafFix Devices, with 39 years of experience, is based in San Clemente in the US state of California. The company designs and manufactures products that comply with international highway safety regulations, providing effective solutions for traffic management and accident prevention.

For more information on companies in this article

Related Content

  • Bridge uses new forming carriage
    February 7, 2012
    The Holzmatttal Bridge for the A98 autobahn in southern Germany stretches 410m across the valley, and on this build the newly-developed Doka forming carriage TU is said to have demonstrated precisely how it drives progress with extremely short cycle times and speedy forming and stripping out operations. The underslung carriage also permits unobstructed access for site traffic.
  • Powerful reclaimer/stabiliser aids road upgrade
    March 15, 2012
    A US contractor is upgrading rural Pennsylvania roads with the aid of a powerful new reclaimer/stabiliser Much of the United States highway infrastructure continues to deteriorate due to lack of a comprehensive road bill and eroding investment in the nation’s roads. However, some of the country’s secondary and rural roads are being upgraded, and funding is coming from unlikely private sources. Energy companies with stakes in the Marcellus and Utica deep shale gas reserve development are working with local
  • Innovative testing boosts pavement quality
    February 16, 2012
    Innovative materials testing technology will allow the road sector to boost pavement quality, Mike Woof and Patrick Smith report. With billions being spent on highway construction worldwide, governments are looking to make sure their investments last as long as possible.
  • High speed bridge demolition minimises disruption
    April 13, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.