Skip to main content

Geosynthetic for temporary use on construction sites

Geosynthetic producer TERRAM is offering a new version of its GrassProtecta range, which can help improve access on temporary job sites. The product can reinforce and protect grass surfaces and prevent them from being damaged by light vehicle traffic. These can be used on temporary parking areas or for construction sites where temporary access is needed across grassy areas, preventing damage and also ensuring that light construction machines do not become bogged down on soft ground. There are three ne
March 13, 2017 Read time: 2 mins
Geosynthetic producer TERRAM is offering a new version of its GrassProtecta range, which can help improve access on temporary job sites.

The product can reinforce and protect grass surfaces and prevent them from being damaged by light vehicle traffic. These can be used on temporary parking areas or for construction sites where temporary access is needed across grassy areas, preventing damage and also ensuring that light construction machines do not become bogged down on soft ground.

There are three new versions; GrassProtecta Lite, GrassProtecta Medium and GrassProtecta Heavy. GrassProtecta Lite is a 10mm mesh suitable for withstanding the pressures of occasional car parking and heavy pedestrian traffic. GrassProtecta Medium is a 13mmthick mesh suitable for overspill parking, occasional maintenance vehicle access and regular residential parking. GrassProtecta Heavy offers additional strength through a 14.5mm mesh. The product is suitable for paths with regular vehicle access, event parking spaces or occasional industrial vehicle parking.

Each solution is available in rolls of 1m or 2m wide with lengths of 10m or 20m.

Related Content

  • JCB improves utility offering
    November 29, 2012
    JCB is improving the performance of key models in the telehandler, boom loader and mini excavator ranges The telehandler models now offer higher performance, for lower fuel consumption. And JCB has broadened its range with the addition of the 550-80, able to lift a 5tonne load to 8m, as well as the 540-20, with a maximum payload of 4tonnes and a maximum lift height of 20m. The 535-140 telehandler is a key mid-range machine for the company and offers load-sensing hydraulics, further improving its efficiency
  • Breaking with Indeco hammers
    April 16, 2018
    Contractor New Hampshire Rock Reduction is using hydraulic hammers from Indeco for rock breaking and excavation duties. The firm says that it selected these units so as to optimise productivity and has used the breakers in quarrying as well as site development applications. Located in the northeast corner of the US, New Hampshire is one of the country’s smallest states. Noted for a rocky terrain, New Hampshire’s geology includes a heavy presence of metamorphic, especially igneous, rock formations, which yi
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w