Skip to main content

Geosynthetic for temporary use on construction sites

Geosynthetic producer TERRAM is offering a new version of its GrassProtecta range, which can help improve access on temporary job sites. The product can reinforce and protect grass surfaces and prevent them from being damaged by light vehicle traffic. These can be used on temporary parking areas or for construction sites where temporary access is needed across grassy areas, preventing damage and also ensuring that light construction machines do not become bogged down on soft ground. There are three ne
March 13, 2017 Read time: 2 mins
Geosynthetic producer TERRAM is offering a new version of its GrassProtecta range, which can help improve access on temporary job sites.

The product can reinforce and protect grass surfaces and prevent them from being damaged by light vehicle traffic. These can be used on temporary parking areas or for construction sites where temporary access is needed across grassy areas, preventing damage and also ensuring that light construction machines do not become bogged down on soft ground.

There are three new versions; GrassProtecta Lite, GrassProtecta Medium and GrassProtecta Heavy. GrassProtecta Lite is a 10mm mesh suitable for withstanding the pressures of occasional car parking and heavy pedestrian traffic. GrassProtecta Medium is a 13mmthick mesh suitable for overspill parking, occasional maintenance vehicle access and regular residential parking. GrassProtecta Heavy offers additional strength through a 14.5mm mesh. The product is suitable for paths with regular vehicle access, event parking spaces or occasional industrial vehicle parking.

Each solution is available in rolls of 1m or 2m wide with lengths of 10m or 20m.

Related Content

  • Solar roads such as Colas’s Wattway could be the right way
    May 10, 2016
    Peter Harrop, chairman of independent research and consultancy IDTechEx, considers arguments in favour of solar roads. Nowadays a major trend is the move to off-grid clean energy created by “energy harvesting” to produce electricity where it is needed. This is more controllable and increasingly at lower cost than grid power or diesel gensets, cleaner and often less subject to interruption. It is taking new forms as revealed in the IDTechEx Research report, “High Power Energy Harvesting 2016-2026”.
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Tampere road tunnel - a strategic link for central Finland
    April 4, 2016
    Progress has been good for an important underground road link in Finland reports Adrian Greeman. Assuming all goes well, the new Ranta, or Lakeside, tunnel in Tampere will open in full six months early; traffic could be running by the end of this year. Work on transforming the rundown city centre with new developments will get a major boost. It is a major achievement on a four-year-long project bringing significant benefits to one of Finland's largest cities. From the government's point of view the scheme w
  • Don't buy, subscribe instead... and stay ahead of the pack
    September 19, 2024
    The traditional way of doing things is to own the construction equipment you need on site. You can buy, or you can rent. You mix and match your technology needs with what is happening on site and your costs go up and down accordingly. However, a new model is emerging: Subscriptions. Take out a flat-fee plan and let someone else make sure you can get access to the latest thinking and the cleverest technology. Pete Kennedy reports.