Skip to main content

Geosynthetic for temporary use on construction sites

Geosynthetic producer TERRAM is offering a new version of its GrassProtecta range, which can help improve access on temporary job sites. The product can reinforce and protect grass surfaces and prevent them from being damaged by light vehicle traffic. These can be used on temporary parking areas or for construction sites where temporary access is needed across grassy areas, preventing damage and also ensuring that light construction machines do not become bogged down on soft ground. There are three ne
March 13, 2017 Read time: 2 mins
Geosynthetic producer TERRAM is offering a new version of its GrassProtecta range, which can help improve access on temporary job sites.

The product can reinforce and protect grass surfaces and prevent them from being damaged by light vehicle traffic. These can be used on temporary parking areas or for construction sites where temporary access is needed across grassy areas, preventing damage and also ensuring that light construction machines do not become bogged down on soft ground.

There are three new versions; GrassProtecta Lite, GrassProtecta Medium and GrassProtecta Heavy. GrassProtecta Lite is a 10mm mesh suitable for withstanding the pressures of occasional car parking and heavy pedestrian traffic. GrassProtecta Medium is a 13mmthick mesh suitable for overspill parking, occasional maintenance vehicle access and regular residential parking. GrassProtecta Heavy offers additional strength through a 14.5mm mesh. The product is suitable for paths with regular vehicle access, event parking spaces or occasional industrial vehicle parking.

Each solution is available in rolls of 1m or 2m wide with lengths of 10m or 20m.

Related Content

  • Brisbane’s new airport link is an engineering success
    April 12, 2013
    Financial troubles for Brisbane's new Airport Link overshadow its construction success – Adrian Greeman writes. Political argument and legal dispute is likely to rage for some time yet over the bankruptcy of Australian road operator BrisConnect, which went into receivership this February with A$3 billion in debt. Toll paying users for its new Airport Link have been less than half the predicted numbers since it opened in July last summer. But if its nancial engineering is being questioned, the same is not t
  • How to reduce environmental impact with Cummins Performance Series
    May 10, 2022
    There has been significant focus on alternative power solutions for off-road vehicles and equipment such as hybrid, full electric and hydrogen. Whilst these solutions will be suitable in the long term, it will take time for these technologies to be competitive and enable wider adopted in the construction industry.
  • Efficient new asphalt compactors from leading firms
    March 12, 2014
    New asphalt compactors from leading firms offer greater versatility and lower running costs - Mike Woof writes
  • Special concrete paver for UK road job
    January 5, 2015
    A specially adapted Wirtgen SP25i concrete slipformer has been used on the M6 motorway near Cannock in the UK. The machine worked together with a Wirtgen ISF25i (independent side feeder) in order to pave a concrete slab under difficult conditions. With an overall length of 373km, the M6 is the longest and one of the most heavily congested motorways in the UK. The M6 connects the M1 motorway near Rugby with Carlisle near the Scottish border. But due to the steadily growing volume of traffic, the Highways