Skip to main content

FPT’s innovative low emissions system

FPT Industrial is introducing a new low emissions package that will allow the firm’s engines to meet the European Stage V requirements. Called the Hi-eSCR2, this patented emissions solution will be used for all engines over 56kW. According to Diego Rotti, from the firm’s product marketing department, the system will be designed with a common architecture that fits on top of the engines, making it simpler to install. He said, “It will require minimum effort for installation. You won’t have to figure out
April 10, 2018 Read time: 2 mins
FPT is introducing a new emissions control system

7935 FPT Industrial is introducing a new low emissions package that will allow the firm’s engines to meet the European Stage V requirements. Called the Hi-eSCR2, this patented emissions solution will be used for all engines over 56kW. According to Diego Rotti, from the firm’s product marketing department, the system will be designed with a common architecture that fits on top of the engines, making it simpler to install. He said, “It will require minimum effort for installation. You won’t have to figure out wiring or hoses.”

A key feature is that the system does not have a separate particulate filter. Instead, the HI-eSCR2 system integrates its particulate filtration system into the SCR module. Rotti said, “We have a single component that carries out both tasks.”

The package includes patented technology and the firm says that its design simplifies the installation and also cuts maintenance needs. According to FPT, the HI-eSCR2 occupies the same space as the previous after-treatment solution HI-eSCR used for Stage IV, without compromising performance. The firm claims that its solution delivers best-in-class power and torque density and for high load or high power applications, users have no need to halt equipment during operations for filter regeneration.

The package has been developed with the help of FPT’s experience in the on-highway sector and uses much proven technology to ensure its reliability in the field according to the firm.

For more information on companies in this article

Related Content

  • Bentley Systems strikes bridge monitoring deal with AASHTO
    November 15, 2012
    A new partnership between Bentley Systems and the American Association of Highway Transportation Officials (AASHTO) looks set to yield significant cost benefits for the US. This move will see AASHTO and Bentley align to extend AASHTO’s Bridge Management software with Bentley’s Inspectech package. As a result, bridge inspection processes in the US will become more efficient, more accurate and also see major budget reductions. CEO Greg Bentley said, “In the US we spend about US$1 billion/year on bridge inspec
  • Cummins develops and introduces cleaner engines
    February 28, 2018
    Cummins is proceeding on track with its plan to meet the Stage V European emissions requirements. The firm has so far completed 100 Stage V customer installations across a range of off-highway machine types including compressors, back-hoe loaders, dump trucks, drills, pavers, cranes, excavators and wheeled loaders. The firm is now offering Stage V engines with power outputs from 74-503kW and claims the units offer higher performance, more reliability, better productivity, improved fuel efficiency and
  • New safety barrier solutions protect road users
    February 21, 2012
    Novel safety barrier solutions are coming to market, writes Mike Woof The safety barrier market is a focus for innovative products designed to meet a range of different applications. The diverse range of vehicle types on the road poses numerous technical challenges to barrier manufacturers. At the same time, different applications such as motorcycle safety, end treatments, bridge barriers and roadside obstacle protection require novel solutions. Although motorcycles account for only a small proportion of ve
  • New low emission, versatile asphalt plant from Marini
    January 6, 2017
    Marini’s new eTOWER asphalt plants are said to complete the firm’s Top Tower line-up. The existing Top Tower plants offer capacities of 280-400tonnes/hour and the eTOWER machines are designed with output of 150 and 180tonnes/hour. The units benefits from features used in the Top Tower range such as the drying/filtering tower system. This features as innovative location for the filter and under-filter hopper, above the dryer drum, which is said to help reduce energy consumption. This modular plant can be sup