Skip to main content

Foran Equipment helps Kananaskis kayakers construct course

In the Canadian Rocky Mountains, there was a window of opportunity of only several days before these excavators had to be out of the Kananaskis River ahead of nearby Barrier Dam releasing its water. The provincial Alberta Whitewater Association hired local contractor Foran Equipment to bring in their equipment in to re-work the riverbed after severe flooding in June 2013 washed out the kayaking courses.
April 27, 2016 Read time: 3 mins

In the Canadian Rocky Mountains, there was a window of opportunity of only several days before these excavators had to be out of the Kananaskis River ahead of nearby Barrier Dam releasing its water.

The provincial Alberta Whitewater Association hired local contractor Foran Equipment to bring in their equipment in to re-work the riverbed after severe flooding in June 2013 washed out the kayaking courses.

Southern parts of Alberta province suffered severe storms and massive flooding that month which devastated several small foothills towns and even the city of Calgary.

Provincial authorities held back water at the Barrier Dam while communities got to work repairing riverside and riverbed damage and beefed up flood protection systems.

Meanwhile, the Alberta Whitewater Association took the opportunity to rebuild a favourite kayaking course. “We had to work fast and efficiently because that dam’s water was going to be released no matter what,” said Chuck Lee, executive director of the Alberta Whitewater Association and in charge of the riverbed reconstruction.

Excavators arrived on flatbeds and slipped onto the river’s bed where the banking was low. They quickly set about rearranging boulders, shifting mountains of rock and mud and setting down new reinforced concrete blocks.

Objects had to be laid out so the rushing waters would create eddies, washes and currents suitable for kayak training and racing courses.

Since finishing the work, the section of the river has been used numerous times for training and races, and is also a popular weekend destination for campers.

It was June 21, 2013, when rain runoff raged down several mountains engulfing floodplains and swept away everything in its path. Especially hard hit was the small resort town of Canmore, about a 45-minute drive west of Calgary, which also suffered severe flooding to its city centre.

In Canmore, felled trees and giant boulders in the Cougar River did most of the damage, carving out an estimates 130,000m2 of the creek bed and banks. The river cut a swath through an expensive housing estate, carving out and carrying away entire million-dollar houses.

In the aftermath, the Canadian federal and Alberta provincial government poured millions of dollars into the Canmore area to improve flood protection schemes. As one Canmore land surveyor told World Highways at the time, local construction companies had never been so busy.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Click here false http://www.youtube.com/watch?v=Pu2dTg9pdHg false false%> to see the Cougar River nibbling away at a luxury home and a lone excavator, in the pouring rain, desperately trying to shore up a small road bridge despite the raging waters.

Related Content

  • Faster than a speeding cow – your local bus maybe?
    May 22, 2015
    A methane-powered bus has set a speed record for a regular city bus of nearly 124km/h at a test track in the UK, according to media reports. The bus, from the southern city of Reading, was converted to run on compressed methane from cow manure and was painted black and white like a Friesian cow. Mechanics removed the bus’s engine governor that restricted the vehicle’s speed to 90km/h. The bus then broke the record on the banked high-speed circuit at Millbrook Proving Ground, near the city of Bedford.
  • First stage of Chain of Rocks Bridge demolition carried out in US
    January 21, 2015
    Demolition work has been carried out on the central section of the Chain of Rocks Bridge in the US. The bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri. For the demolition work to be carried out I-270 had to be closed to traffic, so as to ensure the new structure would not suffer damage and also to maximise safety. The other sections of the bridge will be removed in due course.
  • Kronprinsesse Marys Bro bridges Roskilde Fjord
    January 10, 2019
    A BESIX joint venture is giving the royal treatment to the new Kronprinsesse Marys Bro across Roskilde Fjord, writes David Arminas It was announced in September 2016 that Belgian group BESIX, in a joint venture (RBAI) with Italian firm Rizzani de Eccher and Spanish company Acciona Infraestructuras, had been chosen for the €133 million project. The award, by client Vejdirektoratet (Danish Road Directorate), marked the entry of BESIX into the Scandinavian market. Vejdirektoratet praised the winning bid as
  • Aceh Road Rehabilitation project wins key IRF GRAA award
    May 15, 2014
    The 9.1 magnitude earthquake and resulting series of tsunamis that struck Sumatra, Indonesia, in 2004 destroyed communities in 11 countries. Hardest hit was the Indonesian province of Aceh; an estimated 174,000 people were killed and 500,000 displaced. Basic infrastructure was left in ruin while the primary road along the west coast was destroyed. Vehicles making the trip had to navigate unpaved gravel roads, one-lane temporary bridges, and improvised ferries. Given the cataclysmic events that devastated th