Skip to main content

Faster Repairs

An innovative road repair technology should be able to cut delays and congestion when surface maintenance is required. This new approach has already been proven successfully on a busy highway stretch in the UK and is now likely to be introduced more widely in Europe. The Nu-Phalt system minimises the need for material transport to site, reducing the additional congestion caused by heavy truck traffic to a workzone. A crew of two is able to work from a single vehicle and without the need for pneumatic or hyd
September 3, 2012 Read time: 2 mins

An innovative road repair technology should be able to cut delays and congestion when surface maintenance is required. This new approach has already been proven successfully on a busy highway stretch in the UK and is now likely to be introduced more widely in Europe. The 5089 Nu-Phalt system minimises the need for material transport to site, reducing the additional congestion caused by heavy truck traffic to a workzone. A crew of two is able to work from a single vehicle and without the need for pneumatic or hydraulic breakers. The system melts the area being repaired with infra-red heating and then bonds the repair material on site.

A recent trial of the system was carried out at the Silverstone racing circuit in the UK, producing a level surface. This was of particular importance on the track given the high speed that racing cars attain and the limited suspension travel they feature.

For more information on companies in this article

Related Content

  • Berco’s pioneering status for undercarriage solutions
    October 18, 2021
    Components specialist Berco has been a key industry pioneer of innovative undercarriage solutions. The company has introduced several recent innovations that operate in demanding surroundings
  • Bitumen tech: innovation for decarbonisation
    June 4, 2024
    Kristina Smith examines four new products and processes, including bio-bitumen produced from algae, designed to lower the carbon footprint of asphalt mixes.
  • Mini-bridge aids Forth repairs
    July 17, 2012
    An engineering "first" means that rehabilitation work on a vital Scottish bridge built over 40 years ago can be carried out smoothly A new report to the Forth Estuary Transport Authority (FETA) in Scotland recommends appointing Balfour Beatty Civil Engineering of Edinburgh as 'preferred bidder' to carry out the scheduled replacement of the bridge's main expansion joints in 2009. However, the report to the bridge authority says the tender price of £13.7 million (US$21.3 million) is some £5 million ($7.8 mill
  • Tough competition in concrete paving market
    February 13, 2012
    One thing is clear in the concrete slipforming sector. This comparatively niche market for equipment is rapidly becoming a good deal more competitive as key manufacturers jostle for position.