Skip to main content

Faster Repairs

An innovative road repair technology should be able to cut delays and congestion when surface maintenance is required. This new approach has already been proven successfully on a busy highway stretch in the UK and is now likely to be introduced more widely in Europe. The Nu-Phalt system minimises the need for material transport to site, reducing the additional congestion caused by heavy truck traffic to a workzone. A crew of two is able to work from a single vehicle and without the need for pneumatic or hyd
September 3, 2012 Read time: 2 mins

An innovative road repair technology should be able to cut delays and congestion when surface maintenance is required. This new approach has already been proven successfully on a busy highway stretch in the UK and is now likely to be introduced more widely in Europe. The 5089 Nu-Phalt system minimises the need for material transport to site, reducing the additional congestion caused by heavy truck traffic to a workzone. A crew of two is able to work from a single vehicle and without the need for pneumatic or hydraulic breakers. The system melts the area being repaired with infra-red heating and then bonds the repair material on site.

A recent trial of the system was carried out at the Silverstone racing circuit in the UK, producing a level surface. This was of particular importance on the track given the high speed that racing cars attain and the limited suspension travel they feature.

For more information on companies in this article

Related Content

  • How to maintain a city road by day and Formula 1 track by night
    February 22, 2019
    Nearly a decade on from when Singapore’s Formula 1 (F1) track was first laid, Shell Bitumen’s high-performance binder, Shell Cariphalte, has been selected once more for resurfacing works. The Federation Internationale de l’Automobile (FIA) sets stringent standards for the performance of its tracks, which are made even more challenging given Singapore’s climate. The road surface must remain constant, despite temperatures of up to 30oC and humidity levels above 70%. The 5km Marina Bay Street Circuit, which
  • Researchers trial 3D printing for both concrete and asphalt roads
    March 20, 2019
    Nearly a decade on from when Singapore’s Formula 1 (F1) track was first laid, Shell Bitumen’s high-performance binder, Shell Cariphalte, has been selected once more for resurfacing works. The Federation Internationale de l’Automobile (FIA) sets stringent standards for the performance of its tracks, which are made even more challenging given Singapore’s climate. The road surface must remain constant, despite temperatures of up to 30oC and humidity levels above 70%. The 5km Marina Bay Street Circuit, wh
  • The need to repair and replace the world's bridges
    March 13, 2012
    The future of Scotland's Forth Road Bridge is posing serious questions with a wide potential impact for the transportation sector.
  • The need to repair and replace the world's bridges
    February 22, 2012
    The future of Scotland's Forth Road Bridge is posing serious questions with a wide potential impact for the transportation sector. All over the world existing highway bridges are in need of repair and replacement, with potentially catastrophic consequences should this need be ignored.