Skip to main content

Faster Repairs

An innovative road repair technology should be able to cut delays and congestion when surface maintenance is required. This new approach has already been proven successfully on a busy highway stretch in the UK and is now likely to be introduced more widely in Europe. The Nu-Phalt system minimises the need for material transport to site, reducing the additional congestion caused by heavy truck traffic to a workzone. A crew of two is able to work from a single vehicle and without the need for pneumatic or hyd
September 3, 2012 Read time: 2 mins

An innovative road repair technology should be able to cut delays and congestion when surface maintenance is required. This new approach has already been proven successfully on a busy highway stretch in the UK and is now likely to be introduced more widely in Europe. The 5089 Nu-Phalt system minimises the need for material transport to site, reducing the additional congestion caused by heavy truck traffic to a workzone. A crew of two is able to work from a single vehicle and without the need for pneumatic or hydraulic breakers. The system melts the area being repaired with infra-red heating and then bonds the repair material on site.

A recent trial of the system was carried out at the Silverstone racing circuit in the UK, producing a level surface. This was of particular importance on the track given the high speed that racing cars attain and the limited suspension travel they feature.

For more information on companies in this article

Related Content

  • Europe's smart road pricing project
    April 12, 2012
    New trials pave the way for smart road pricing using Global Navigation Satellite Systems (GNSS). In recent years, the concept of road charging has been gaining acceptability among Europe's policymakers.
  • Stonehenge tunnel project being designed
    April 12, 2017
    Consultant AECOM is now working with Highways England on improvements to the busy A303 in the UK. The road upgrades will be carried out between Amesbury and Berwick South Down along a 13km section of the A303 route. AECOM will work with its supply chain partners Mace and Mouchel on the project. As the current alignment for the A303 passes just 165m from the Stonehenge World Heritage site (WHS), there is a strong need to redevelop the route so that it causes less harm to this important archaeological area. T
  • Paving a Japanese airport within strict time constraints
    September 19, 2012
    In Japan, major efforts are being made to both conserve energy and materials, while also delivering high quality airport runways. At Haneda Airport, as well as at the Fukuoka, Chitose and Sendai airports, innovative use is being made of asphalt paving equipment from Sumitomo. The latest model HA60W J paver from Sumitomo is being used to lay warm mix asphalt, while the contractors is also using sophisticated control technology. To minimise disruption to flight schedules, construction work at Haneda has been
  • India’s road to safety
    September 5, 2012
    India's growth rate is the envy of the world, and its infrastructure is rapidly improving, but its road safety record is the world's worst. Patrick Smith reports on a conference aimed at finding answers to the problems Ambling through the gardens and marble magnificence that is the Taj Mahal or gazing down on the city of Jaipur from the hilltop Jaigarh Fort is far removed from the world outside.