Skip to main content

Faster Repairs

An innovative road repair technology should be able to cut delays and congestion when surface maintenance is required. This new approach has already been proven successfully on a busy highway stretch in the UK and is now likely to be introduced more widely in Europe. The Nu-Phalt system minimises the need for material transport to site, reducing the additional congestion caused by heavy truck traffic to a workzone. A crew of two is able to work from a single vehicle and without the need for pneumatic or hyd
September 3, 2012 Read time: 2 mins

An innovative road repair technology should be able to cut delays and congestion when surface maintenance is required. This new approach has already been proven successfully on a busy highway stretch in the UK and is now likely to be introduced more widely in Europe. The 5089 Nu-Phalt system minimises the need for material transport to site, reducing the additional congestion caused by heavy truck traffic to a workzone. A crew of two is able to work from a single vehicle and without the need for pneumatic or hydraulic breakers. The system melts the area being repaired with infra-red heating and then bonds the repair material on site.

A recent trial of the system was carried out at the Silverstone racing circuit in the UK, producing a level surface. This was of particular importance on the track given the high speed that racing cars attain and the limited suspension travel they feature.

For more information on companies in this article

Related Content

  • Doha’s massive ring road expressway project
    July 10, 2019
    The huge Doha ring road project will help decongest the city and improve transport for Qatar
  • Mixing recycled and fresh asphalt reduces costs
    February 14, 2012
    An innovative asphalt plant is allowing the use of recycled materials and achieving major cost benefits - Mike Woof reports. UK construction firm FM Conway is seeing the benefit of the €11.5 million (£10 million) it has invested in its asphalt production facilities at Erith in Kent, close to UK capital London, since buying the site in 2005. The biggest single investment in the facility has been a new Benninghoven asphalt plant, which was commissioned in June 2010 and is now the core of the Erith operation.
  • UK Government finalising plans for Stonehenge road tunnel
    January 12, 2017
    The UK Government is finalising its plans for the construction of a road tunnel close to the famous Stonehenge monument in Wiltshire. The 2.9km tunnel will carry the A303, a busy road that carries heavy traffic, particularly during the holiday season when large numbers of tourists pass through the area. The existing route passes close to the Stonehenge monument but the road is widely recognised as being unfit for purpose. As well as carrying cars, it handles a high percentage of large trucks, including heav
  • Scotland’s new Queensferry Crossing over the Forth Estuary
    December 23, 2015
    The new Queensferry Crossing under construction in Scotland will be the third landmark bridge spanning the Forth Estuary - Mike Woof writes When the new Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. Lying alongside the existing road bridge and the historic rail bridge, this new structure will be as groundbreaking as the two earlier crossings were at the time of their construction.