Skip to main content

Faster patching

Ennis Prismo is introducing a new pothole reinstatement product called Repair and a novel temporary line marking system. The pothole product is said to be quick, easy and safe to use, as well as being inexpensive to purchase. This product requires little training to use and is said to be ready to carry traffic soon after installation, reducing delays and disruptions. It is also said to provide a long-lasting repair even on roads with high traffic volumes. Meanwhile the temporary line marking system is said
February 10, 2012 Read time: 1 min
1394 Ennis Prismo is introducing a new pothole reinstatement product called Repair and a novel temporary line marking system.

The pothole product is said to be quick, easy and safe to use, as well as being inexpensive to purchase. This product requires little training to use and is said to be ready to carry traffic soon after installation, reducing delays and disruptions. It is also said to provide a long-lasting repair even on roads with high traffic volumes.

Meanwhile the temporary line marking system is said to offer high retroreflectivity even in wet conditions, boosting safety at night. Called Rainline, this high visibility thermoplastic material is said to be quick to install and can be used to denote areas of temporary workings. Highly versatile, it can also be removed quickly when road repairs or alignment changes are complete.

For more information on companies in this article

Related Content

  • Kistler WiM for Caltrans
    February 10, 2023
    Caltrans, the transportation agency of the US state of California, needs to effectively plan maintenance, design roads and keep bridges in good condition. But existing measuring technology was limited to solely counting and classifying vehicles according to their type, for instance, passenger cars, buses or trucks.
  • Brine spraying can boost winter road safety and cut materials costs
    February 16, 2015
    A study on the use of a brine sprayer on the A8 Autobahn in Germany has yielded valuable data - *Jo Rommeswinkel writes. Since 2007, Autobahnplus Services (a+S) has been providing the operation and maintenance services on the 52km concession Autobahn A8 between Munich and Augsburg in Bavaria, a region renowned for its severe winter maintenance conditions. The Munich Augsburg section comprises 48km of six-lane dual carriageway and 4km of four-lane dual carriageway. Part of the road surface consists of low-no
  • Terex cranes in a tight spot in Michigan
    February 6, 2017
    Terex cranes have been involved in a multiple bridge repair project in the US More than 96,000 vehicles per day travel a stretch of I-96, including its 52-year-old bridges. The Michigan Department of Transportation is in the midst of a two-year US$77 million project to repair bridges and relieve increasing congestion along Interstate 96 at the U.S. Highway 23 interchange in Livingston County. Toebe Construction along with joint venture partner Kamminga & Roodvoets are bringing in a lot of lifting powe
  • Runway resurfacing in Brussels
    April 2, 2021
    Years of heavy use meant that runway 25 at Brussels Airport required attention, with a full resurfacing needed. Smooth runways are vital for large international airports as they optimise safety and reduce wear and tear on expensive aircraft, in addition to boosting comfort for airline crews and passengers.