Skip to main content

Faster, better paving with Topcon's P-32 paving system

Topcon positioning group has made improvements to its P-32 asphalt paving system, which aim to give faster, better quality paving. It has added an ST-3 sonic tracker and an anti-vibration slop sensor to the system and updated the GC-35 control box.
March 11, 2014 Read time: 2 mins
342 Topcon positioning group has made improvements to its P-32 asphalt paving system, which aim to give faster, better quality paving. It has added an ST-3 sonic tracker and an anti-vibration slop sensor to the system and updated the GC-35 control box.

"The P-32 paver system was built to improve smoothness, ensure accurate slope and material thickness and provide unmatched operator ease-of-use," said Kris Maas, machine control product marketing manager for Topcon. "The P-32 saves time and improves safety by allowing an operator to view elevation and slope values of the screed from a single control box. With these new components, this state-of-the-art 2d control system will continue to improve the speed and quality of asphalt paving."

The ST-3 sonic tracker will provide higher accuracy in positioning and improves operation in tight areas. "The introduction of the ST-3 sonic tracker will increase productivity for users by providing smoother surface detections," said Maas. “The smoother it can be the fast the job will finish."

The new slope sensor will also add to accuracy and has been designed to cope in a rage of conditions. According to Maas, the sensor is resistant to vibrations and works well within different temperature ranges.

The changes to the control box mean that the Cross slope value will be displayed even when the control box is set in elevation control mode on both sides. "This takes the guess work out of knowing whether the Cross slope is correct. Additionally, block slope calibration protects users from accidently changing the slope sensor while the P-32 system is in operation." said Maas.
www.topconpositioning.com

For more information on companies in this article

Related Content

  • Topcon unveils web-based construction management tool
    April 17, 2013
    Topcon is introducing Enterprise3D, a subscription web-based construction and engineering management tool which aids complete job site planning and scheduling. Reports from and to the system can be sent via Topcon’s sitelink3D.net web portal from anywhere in the world.
  • Smooth sailing for paving with Topcon’s SmoothRide
    April 14, 2016
    Topcon Positioning Group’s new road scanning solution SmoothRide can gather highway asset data at highway speeds with no need for lane closures, crash trucks or escorts. SmoothRide is a vehicle-mounted resurfacing solution for paving and milling projects. It uses a combination of core Topcon technologies designed to deliver the smoothest surface possible, while efficiently managing the quantity of material for each project.
  • Topcon and DynaRoad announce major software upgrade
    January 6, 2017
    Topcon Positioning Group and DynaRoad Oy of Helsinki, Finland, have announced the release of DynaRoad 5.3 construction planning and control software.

 Juuso Makinen, CEO of DynaRoad Oy, said, “One of the largest project management challenges is collecting real-time information from large sites and comparing it to plans. We’re excited to be the first ones offering a solution to this.” DynaRoad claims to be the first software in the world to automatically monitor, update, and report schedule progress of eart
  • Topcon and DynaRoad announce major software upgrade
    April 18, 2013
    Topcon Positioning Group and DynaRoad Oy of Helsinki, Finland, have announced the release of DynaRoad 5.3 construction planning and control software.

 Juuso Makinen, CEO of DynaRoad Oy, said, “One of the largest project management challenges is collecting real-time information from large sites and comparing it to plans. We’re excited to be the first ones offering a solution to this.” DynaRoad claims to be the first software in the world to automatically monitor, update, and report schedule progress of eart