Skip to main content

Fast utilities inspection with Saint Gobain

A new partnership between MWay Communications, Saint-Gobain PAM UK and Stanton Bonna has resulted in an access cover installation that cuts time on site by 50%. The system also improves site safety and ensures high quality standards are met for reduced future maintenance. The innovative precast concrete motorway communications chamber slab was developed by MWay Communications. The system is now on the market through a joint venture between Saint-Gobain PAM UK and Stanton Bonna to precast the access chamb
July 6, 2016 Read time: 2 mins
A new partnership between MWay Communications, 5475 Saint-Gobain PAM UK and Stanton Bonna has resulted in an access cover installation that cuts time on site by 50%. The system also improves site safety and ensures high quality standards are met for reduced future maintenance.

The innovative precast concrete motorway communications chamber slab was developed by MWay Communications. The system is now on the market through a joint venture between Saint-Gobain PAM UK and Stanton Bonna to precast the access chamber cover slab off site. By manufacturing the access chamber slab in a factory, the partners can reduce the time for on-site installation. This makes a major reduction in overall working time.

The on-site installation is reduced to two steps: excavation and installation of the chamber before installing the precast hard standing and completing the earthworks. The installation work can be carried out in virtually all weather conditions. Saving onsite installation time improves efficiency and frees up resources for other tasks, while reducing manual handling and movement of vehicles and people on site, the solution also improves safety.

The patent pending solution combines high-quality steel reinforced precast concrete with Saint Gobain PAMs high-performance ductile iron Opt-Emax access covers and Warrior surface boxes.  

Two solutions have initially been developed: an A type chamber cover slab and a smaller B type chamber cover slab. Both have cast-in lifting anchors to aid safe offloading and installation. Once installed the Opt-Emax access cover is designed for frequent maintenance and inspection of below ground assets.  The cover sections are individually hinged to reduce lifting effort, it has a skid resistant design and security is provided using Saint-Gobain PAM’s patented T-LOK system.

For more information on companies in this article

Related Content

  • Skid resistant drain covers boost safety
    February 14, 2012
    SAINT-GOBAIN PAM UK says that it has a number of innovative new solutions for road infrastructure. The novel GripTop range of access covers can help reduce the risk of skidding among two-wheeled road users and feature an aggregate surface designed to boost safety. The firm's Aquamax gully grate has high absorption capacities that allow them to quickly and safely drain roads suffering heavy rain. Aquamax also incorporates heavy duty features which enable it to cope with stringent traffic conditions while pro
  • Austria's first PPP project takes shape
    July 31, 2012
    North of the Austrian capital Vienna, one of the region's biggest transport infrastructure projects for decades is currently under construction, the A5 Nordautobahn. This will give the Greater Vienna region its first-ever high-capacity link to the Czech motorway and arterial road network, greatly easing congestion on the old main road. In the first phase of construction, 22.7km of motorway are to be built. Work on the second section, all the way through to the Czech border, is to start in 2010. The A5 Norda
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Closer ties with Highways England Collaborative Delivery Framework
    April 13, 2017
    Highways England is reconsidering its procurement to encourage innovation and ultimately deliver more for less. Kristina Smith spoke to client, contractors and material suppliers to find out more. A group of senior managers is being addressed by a local resident who lives close to some proposed road works. The resident is angry, persistent and quite rude. The question is: how will these managers respond?