Skip to main content

Fast utilities inspection with Saint Gobain

A new partnership between MWay Communications, Saint-Gobain PAM UK and Stanton Bonna has resulted in an access cover installation that cuts time on site by 50%. The system also improves site safety and ensures high quality standards are met for reduced future maintenance. The innovative precast concrete motorway communications chamber slab was developed by MWay Communications. The system is now on the market through a joint venture between Saint-Gobain PAM UK and Stanton Bonna to precast the access chamb
July 6, 2016 Read time: 2 mins
A new partnership between MWay Communications, 5475 Saint-Gobain PAM UK and Stanton Bonna has resulted in an access cover installation that cuts time on site by 50%. The system also improves site safety and ensures high quality standards are met for reduced future maintenance.

The innovative precast concrete motorway communications chamber slab was developed by MWay Communications. The system is now on the market through a joint venture between Saint-Gobain PAM UK and Stanton Bonna to precast the access chamber cover slab off site. By manufacturing the access chamber slab in a factory, the partners can reduce the time for on-site installation. This makes a major reduction in overall working time.

The on-site installation is reduced to two steps: excavation and installation of the chamber before installing the precast hard standing and completing the earthworks. The installation work can be carried out in virtually all weather conditions. Saving onsite installation time improves efficiency and frees up resources for other tasks, while reducing manual handling and movement of vehicles and people on site, the solution also improves safety.

The patent pending solution combines high-quality steel reinforced precast concrete with Saint Gobain PAMs high-performance ductile iron Opt-Emax access covers and Warrior surface boxes.  

Two solutions have initially been developed: an A type chamber cover slab and a smaller B type chamber cover slab. Both have cast-in lifting anchors to aid safe offloading and installation. Once installed the Opt-Emax access cover is designed for frequent maintenance and inspection of below ground assets.  The cover sections are individually hinged to reduce lifting effort, it has a skid resistant design and security is provided using Saint-Gobain PAM’s patented T-LOK system.

For more information on companies in this article

Related Content

  • Grand achievement for Intermountain
    July 18, 2012
    A versatile solution has helped with a tricky project at the Grand Canyon in the US – Pierre Peltier When Intermountain Slurry Seal, a division of Granite Construction, submitted its bid in 2009 to repair roads and parking lots along the Grand Canyon’s North Rim, the company knew the job would come with challenges. The remote roads leading from Jacob’s Lake, Arizona, to the North Rim Lodge had deteriorated to a point that the Federal Highway Association’s (FHWA) Central Federal Lands (CFL) Highway Division
  • Turkey’s important new tunnel will improve transport links
    May 18, 2016
    Major advances in tunnelling will allow cars to travel underneath the Bosphorus sea channel in Turkey's Istanbul next year when its third road link is opened, writes Adrian Greeman. The Bosphorus is redolent with history and strategic significance. As one of the world's most significant sea connections, linking the landlocked Black Sea to the Marmara Sea and the Mediterranean beyond, it has been vitally important for trade and crucial for military access. It is also one of the biggest obstacles for land tra
  • Seal of approval
    August 2, 2012
    Timely maintenance using proven cost-effective methods can extend the life of a highway by many years as Patrick smith reports Highways are expensive assets to construct, and the wear and tear of modern traffic means that regular maintenance will delay costly repairs or in extreme cases reconstruction. There are a number of methods of carrying out such maintenance, and these include the use of slurry seals and micro-surfacing, which are cold mixed asphalt which is a mixture of graded aggregate, asphalt emul
  • Upgrading a busy A road link in the UK
    July 4, 2018
    The upgrade to the UK’s busy A14 route will address a significant traffic bottleneck - Mike Woof writes The UK is suffering badly from traffic congestion, a problem that is particularly severe in and around its major cities. Lack of investment in road construction over many years has resulted in a major backlog of work, while the country has seen growing vehicle numbers. To make matters worse, there have been few additions to the major road network since the late 1980s and early 1990s. And the combinatio