Skip to main content

Fast utilities inspection with Saint Gobain

A new partnership between MWay Communications, Saint-Gobain PAM UK and Stanton Bonna has resulted in an access cover installation that cuts time on site by 50%. The system also improves site safety and ensures high quality standards are met for reduced future maintenance. The innovative precast concrete motorway communications chamber slab was developed by MWay Communications. The system is now on the market through a joint venture between Saint-Gobain PAM UK and Stanton Bonna to precast the access chamb
July 6, 2016 Read time: 2 mins
A new partnership between MWay Communications, 5475 Saint-Gobain PAM UK and Stanton Bonna has resulted in an access cover installation that cuts time on site by 50%. The system also improves site safety and ensures high quality standards are met for reduced future maintenance.

The innovative precast concrete motorway communications chamber slab was developed by MWay Communications. The system is now on the market through a joint venture between Saint-Gobain PAM UK and Stanton Bonna to precast the access chamber cover slab off site. By manufacturing the access chamber slab in a factory, the partners can reduce the time for on-site installation. This makes a major reduction in overall working time.

The on-site installation is reduced to two steps: excavation and installation of the chamber before installing the precast hard standing and completing the earthworks. The installation work can be carried out in virtually all weather conditions. Saving onsite installation time improves efficiency and frees up resources for other tasks, while reducing manual handling and movement of vehicles and people on site, the solution also improves safety.

The patent pending solution combines high-quality steel reinforced precast concrete with Saint Gobain PAMs high-performance ductile iron Opt-Emax access covers and Warrior surface boxes.  

Two solutions have initially been developed: an A type chamber cover slab and a smaller B type chamber cover slab. Both have cast-in lifting anchors to aid safe offloading and installation. Once installed the Opt-Emax access cover is designed for frequent maintenance and inspection of below ground assets.  The cover sections are individually hinged to reduce lifting effort, it has a skid resistant design and security is provided using Saint-Gobain PAM’s patented T-LOK system.

For more information on companies in this article

Related Content

  • Norway's bridge meets tough environmental targets
    May 2, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Norway's bridge meets tough environmental targets
    February 27, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Fast and flexible with REBLOC
    May 26, 2021
    Safe highways and roads are of substantial importance for every road user. REBLOC precast concrete barriers are an indispensable part of the road infrastructure offering maximum protection and are delivered with expertise and technical excellence. They contribute significantly to highest levels of road safety in daily road traffic worldwide.
  • The Preston Western Distributor
    September 7, 2023
    Costain, as main contractor for the Preston Western Distributor project, was involved from the earliest stages, thanks to the UK’s Early Contractor Involvement approach. The project was delivered on time and on budget to the benefit of the local environment, local businesses and the region’s workforce. David Arminas reports*