Skip to main content

Fast utilities inspection with Saint Gobain

A new partnership between MWay Communications, Saint-Gobain PAM UK and Stanton Bonna has resulted in an access cover installation that cuts time on site by 50%. The system also improves site safety and ensures high quality standards are met for reduced future maintenance. The innovative precast concrete motorway communications chamber slab was developed by MWay Communications. The system is now on the market through a joint venture between Saint-Gobain PAM UK and Stanton Bonna to precast the access chamb
July 6, 2016 Read time: 2 mins
A new partnership between MWay Communications, 5475 Saint-Gobain PAM UK and Stanton Bonna has resulted in an access cover installation that cuts time on site by 50%. The system also improves site safety and ensures high quality standards are met for reduced future maintenance.

The innovative precast concrete motorway communications chamber slab was developed by MWay Communications. The system is now on the market through a joint venture between Saint-Gobain PAM UK and Stanton Bonna to precast the access chamber cover slab off site. By manufacturing the access chamber slab in a factory, the partners can reduce the time for on-site installation. This makes a major reduction in overall working time.

The on-site installation is reduced to two steps: excavation and installation of the chamber before installing the precast hard standing and completing the earthworks. The installation work can be carried out in virtually all weather conditions. Saving onsite installation time improves efficiency and frees up resources for other tasks, while reducing manual handling and movement of vehicles and people on site, the solution also improves safety.

The patent pending solution combines high-quality steel reinforced precast concrete with Saint Gobain PAMs high-performance ductile iron Opt-Emax access covers and Warrior surface boxes.  

Two solutions have initially been developed: an A type chamber cover slab and a smaller B type chamber cover slab. Both have cast-in lifting anchors to aid safe offloading and installation. Once installed the Opt-Emax access cover is designed for frequent maintenance and inspection of below ground assets.  The cover sections are individually hinged to reduce lifting effort, it has a skid resistant design and security is provided using Saint-Gobain PAM’s patented T-LOK system.

For more information on companies in this article

Related Content

  • Kronprinsesse Marys Bro bridges Roskilde Fjord
    January 10, 2019
    A BESIX joint venture is giving the royal treatment to the new Kronprinsesse Marys Bro across Roskilde Fjord, writes David Arminas It was announced in September 2016 that Belgian group BESIX, in a joint venture (RBAI) with Italian firm Rizzani de Eccher and Spanish company Acciona Infraestructuras, had been chosen for the €133 million project. The award, by client Vejdirektoratet (Danish Road Directorate), marked the entry of BESIX into the Scandinavian market. Vejdirektoratet praised the winning bid as
  • Brisbane’s new airport link is an engineering success
    April 12, 2013
    Financial troubles for Brisbane's new Airport Link overshadow its construction success – Adrian Greeman writes. Political argument and legal dispute is likely to rage for some time yet over the bankruptcy of Australian road operator BrisConnect, which went into receivership this February with A$3 billion in debt. Toll paying users for its new Airport Link have been less than half the predicted numbers since it opened in July last summer. But if its nancial engineering is being questioned, the same is not t
  • Peri formwork for Danish port link tunnel project
    November 29, 2013
    The Nordhavnsvej – Vej- og Tunnelentreprise (Nordhavnsvej) project is Copenhagen’s largest infrastructure project in the last 50 years. The 1.65km-long route will eventually link the Danish capital’s northern port area with the Helsingør motorway. It runs through a very densely built urban area, in parts at depths of up to 22m. One particular challenge regarding the execution was planning the course of the tunnel because the underground structure also crosses a very busy railway line.
  • Diamond in the Pearl: China’s Hong Kong-Zhuhai-Macao Bridge complex
    March 8, 2018
    People in the Pearl River Delta are celebrating the Chinese New Year with the imminent opening of the Hong Kong-Zhuhai-Macao Bridge. David Arminas reviews progress. China’s Spring Festival, or Lunar New Year, is celebrated with the usual enthusiasm and spectacular fireworks. But celebrations will be particularly joyous for many people in the southern Pearl River Delta. The soon-to-be-open Hong Kong-Zhuhai-Macao Bridge (HZMB) will slash travel time between the Hong Kong Special Administrative Region, Zhuh