Skip to main content

Fast patch repairs from Hitex

Hitex International has achieved full BBA certification for its new rapid road repair products. TexPatch and TexBand Solo are fill and over-band products designed to seal and repair potholes, cracks, seams and joints, to prevent further road deterioration. As well as being quick and easy to install, these can handle traffic within minutes to speed up the repair process, minimise disruption and reduce traffic management costs. TexPatch provides a fast, permanent and economical solution to repair potholes
December 7, 2016 Read time: 2 mins
7819 Hitex International has achieved full BBA certification for its new rapid road repair products. TexPatch and TexBand Solo are fill and over-band products designed to seal and repair potholes, cracks, seams and joints, to prevent further road deterioration.

As well as being quick and easy to install, these can handle traffic within minutes to speed up the repair process, minimise disruption and reduce traffic management costs.

TexPatch provides a fast, permanent and economical solution to repair potholes over 15mm deep and up to 1m². It is suitable for all asphaltic surfaces and is a thermoplastic material incorporating polymer modified bitumen compound and granite aggregate.

It is easy to apply using a screed box which ensures a strong thermal bond, providing a permanent solution for heavy traffic applications. The dry material is easier to handle than bituminous product, with no paper bags needing to be stripped.

TexBand Solo rapidly repairs cracks, seams and joints up to 40mm wide in all asphaltic road surfaces and can be used on highly stressed surfaces such as bends and roundabouts. It incorporates grey granite aggregate with a polished stone value (PSV) of 62+ to improve safety by optimising skid resistance. Screed applied, TexBand Solo is less susceptible to weather extremes and can be laid all year round, with two versions for use in cracks from 5-40mm wide and from 40-200mm wide.

For more information on companies in this article

Related Content

  • Asphalt plant innovations from key firms
    June 12, 2017
    Asphalt plant builders continue to develop new technologies to meet different demands from clients. Marini says that in addition to developing new and more sophisticated asphalt plants, the firm is also meeting demands from customers looking to upgrade existing asphalt plants with the addition of new systems. These can be used to boost output and material quality, while also delivering new grades of mixes. At the same time, plant upgrades can reduce the environmental profile of a plant, while improving its
  • Long life and reliability from innovative crusher
    July 9, 2012
    New technology broadens Sandvik's offering for crushing and screening. Mike Woof reports Sandvik is making a series of upgrades to its crushing and screening line in jaw and cone crushers as well as wear parts, and these should suit an array of applications ranging from small recycling operations up to large quarry sites. At the more versatile end of the range is the new CJ208 jaw crusher, the latest addition to the CJ200 series jaw crusher line-up. This crusher is the smallest of the CJ200 Series and offer
  • 'Blinding success' at Welsh quarry
    February 14, 2012
    Wales is renowned for many things but dry weather is not one of them. A combination of being close to the Atlantic and having lots of mountains means that it rains a lot and this is bad news when fine screening limestone using conventional steel wire mesh, which tends to clog and blind over in damp weather.
  • Asphalt reinforcement extends road life
    July 12, 2012
    Special reinforcements can extend the life of an old or new road, and also offer environmental benefits. Patrick Smith reports. Asphalt reinforcement can extend the service life of a resurfaced road by a factor of 3-4, says Huesker, developers of the HaTelit range of asphalt reinforcement. Aimed at preventing the propagation of reflective cracking from an old asphalt layer through a new surface course, Huesker claims the formation of reflective cracking is considerably delayed or even completely prevented u