Skip to main content

Fast patch repairs from Hitex

Hitex International has achieved full BBA certification for its new rapid road repair products. TexPatch and TexBand Solo are fill and over-band products designed to seal and repair potholes, cracks, seams and joints, to prevent further road deterioration. As well as being quick and easy to install, these can handle traffic within minutes to speed up the repair process, minimise disruption and reduce traffic management costs. TexPatch provides a fast, permanent and economical solution to repair potholes
December 7, 2016 Read time: 2 mins
7819 Hitex International has achieved full BBA certification for its new rapid road repair products. TexPatch and TexBand Solo are fill and over-band products designed to seal and repair potholes, cracks, seams and joints, to prevent further road deterioration.

As well as being quick and easy to install, these can handle traffic within minutes to speed up the repair process, minimise disruption and reduce traffic management costs.

TexPatch provides a fast, permanent and economical solution to repair potholes over 15mm deep and up to 1m². It is suitable for all asphaltic surfaces and is a thermoplastic material incorporating polymer modified bitumen compound and granite aggregate.

It is easy to apply using a screed box which ensures a strong thermal bond, providing a permanent solution for heavy traffic applications. The dry material is easier to handle than bituminous product, with no paper bags needing to be stripped.

TexBand Solo rapidly repairs cracks, seams and joints up to 40mm wide in all asphaltic road surfaces and can be used on highly stressed surfaces such as bends and roundabouts. It incorporates grey granite aggregate with a polished stone value (PSV) of 62+ to improve safety by optimising skid resistance. Screed applied, TexBand Solo is less susceptible to weather extremes and can be laid all year round, with two versions for use in cracks from 5-40mm wide and from 40-200mm wide.

For more information on companies in this article

Related Content

  • Geosynthetics give extra strength to soil reinforcement
    May 3, 2012
    Using geosynthetics for soil reinforcement is highly effective but requires a high quality and trusted geogrid. When it comes to deciding which geogrid is best for a specific project, a number of product parameters must be taken into account. In the design of steep slopes, the most important parameter is the available long term design strength (Pdes). Recently, Colbond has significantly increased this factor for its high performance Enkagrid product, recognised with a newly updated BBA (British Board of Ag
  • Macismo announces 8-year licensing deal in North America at the PPRS Paris 2015 pavement preservation and recycling summit
    February 24, 2015
    Doug Shipsey, founder and owner of Macismo International, announced an 8-year licensing agreement with Bonsal American at PPRS 2015 Paris, the pavement preservation and recycling summit. The deal will be the company’s bridgehead into the giant North American market for its innovative Macfix cold asphalt additive that allows repair material to be laid in temperatures from -10⁰C to +60⁰C. According to Shipsey, his Macfix additive is not only resistant to extreme temperature swings, it is also water resistant.
  • Researchers trial 3D printing for both concrete and asphalt roads
    February 27, 2019
    Automated road repairs, using 3D printing, could save money and vastly reduce disruption, and researchers are already showing it’s possible - Kristina Smith reports It’s the middle of the night, and in the street below a team is busy carrying out repairs to the road surface. But there isn’t a human in sight. A road repair drone has landed at the site of a crack and a 3D asphalt printer is now busy filling in that crack. A group of traffic cone drones have positioned themselves around the repair location
  • Beijing airport runway features novel asphalt solution
    December 7, 2017
    Beijing ranks amongst the five busiest airports across the globe and its runway surfaces face tough stresses as a result. Over 94 million passengers flew through Beijing Capital Airport (BCA) in 2016 and as many as 70 flights/hour can take off and land during peak times. The 60m-wide middle runway of Beijing Capital International Airport is the busiest of the three runways, with a landing and take-off flight ratio of up to 40%. This runway was first rehabilitated in 1996 and then repaired in 2013 and 2015