Skip to main content

Fast patch repairs from Hitex

Hitex International has achieved full BBA certification for its new rapid road repair products. TexPatch and TexBand Solo are fill and over-band products designed to seal and repair potholes, cracks, seams and joints, to prevent further road deterioration. As well as being quick and easy to install, these can handle traffic within minutes to speed up the repair process, minimise disruption and reduce traffic management costs. TexPatch provides a fast, permanent and economical solution to repair potholes
December 7, 2016 Read time: 2 mins
7819 Hitex International has achieved full BBA certification for its new rapid road repair products. TexPatch and TexBand Solo are fill and over-band products designed to seal and repair potholes, cracks, seams and joints, to prevent further road deterioration.

As well as being quick and easy to install, these can handle traffic within minutes to speed up the repair process, minimise disruption and reduce traffic management costs.

TexPatch provides a fast, permanent and economical solution to repair potholes over 15mm deep and up to 1m². It is suitable for all asphaltic surfaces and is a thermoplastic material incorporating polymer modified bitumen compound and granite aggregate.

It is easy to apply using a screed box which ensures a strong thermal bond, providing a permanent solution for heavy traffic applications. The dry material is easier to handle than bituminous product, with no paper bags needing to be stripped.

TexBand Solo rapidly repairs cracks, seams and joints up to 40mm wide in all asphaltic road surfaces and can be used on highly stressed surfaces such as bends and roundabouts. It incorporates grey granite aggregate with a polished stone value (PSV) of 62+ to improve safety by optimising skid resistance. Screed applied, TexBand Solo is less susceptible to weather extremes and can be laid all year round, with two versions for use in cracks from 5-40mm wide and from 40-200mm wide.

For more information on companies in this article

Related Content

  • Polish road strengthened by Tensar
    July 31, 2012
    Consultants have specified Tensar techology in the rebuilding of a deteriorating Polish highway in order to meet current standards. The use of Tensar geogrids enabled consultants Drotest and Dro-konsult Warsaw to create a stable asphalt pavement quicker and more economically than using conventional construction methods, says Tensar. The 40km long road, which connects Bartoszyce and Ketrzyhn, had exceeded its design life and clearly showed its structural weakness with bad rutting, extensive fatigue crackin
  • Road recycling saves time and costs, reduces emissions
    February 13, 2012
    Stabilisers bring recycling improvements to roads in the UK and Armenia. The local road authorities near the UK city of Bath have saved nearly €250,500 on the cost of repairing a 400m long section of the B3110 Midford Road. This saving has been achieved by opting to recycle and strengthen in-situ the existing surface, instead of using conventional full depth pavement reconstruction.
  • Quieter roads
    July 20, 2012
    Sound absorption systems can cut traffic noise With traffic volumes increasing worldwide and highways having to be redesigned to minimise their impact on the environment, the industry has had to come up with new solutions that reduce the impact of roads. Highway noise is a major issue both in urban and non-urban locations so engineers have been busy developing innovative solutions that can help alleviate this problem. Durability and effective noise dampening properties are claimed for the new All Weather So
  • Vögele sets paving record in German capital
    September 16, 2015
    Material transfer vehicles and remixing systems are crucial to delivering quality paving. Using material transfer vehicles (MTVs) can play a major role in delivering high quality road surfaces. These units can help boost quality by minimising the risk of material or thermal segregation. A major road paving project has been carried out in Germany using innovative paving methods. For the first time ever, binder and surface courses were paved over a width of 15.5m. This paving job was carried out on a 4.2km st