Skip to main content

FAE upgrading stabiliser technology

FAE says that the latest version of its STABI/H soil stabiliser offers increased productivity. Designed to be towed behind tractors with power outputs of 228-335.5kW the STABI H benefits from an innovative rotor design and integrated transmission. This unit can be used on small and large construction sites, from motorways to secondary Infrastructure as well as parking lots. It has a variable displacement chamber as well as an integrated rotor transmission. It can work to depths of 500mm and is said to ensu
January 6, 2017 Read time: 2 mins
FAE’s new towed stabiliser offers greater productivity
8067 FAE says that the latest version of its STABI/H soil stabiliser offers increased productivity. Designed to be towed behind tractors with power outputs of 228-335.5kW the STABI H benefits from an innovative rotor design and integrated transmission. This unit can be used on small and large construction sites, from motorways to secondary.

Infrastructure as well as parking lots. It has a variable displacement chamber as well as an integrated rotor transmission. It can work to depths of 500mm and is said to ensure optimum mixing quality at all working depths. It has a robust design and a patented holder-teeth system said to increase working life and performance for all working conditions.

Key features include a chain-protected, wide loading opening as well as a dedicated gearbox cooling system for the gearbox, inspection ports for easy maintenance, automatic water injection and an optional grader flap with spring damper

For more information on companies in this article

Related Content

  • New milling machine advances
    June 15, 2020
    Two of the leaders in the milling machine market are now offering upgraded planers
  • On track for excellence in asphalt plants
    May 30, 2013
    While one leading asphalt plant company has played a key role in the creation of the new Circuit of the Americas F1 racetrack, others have been releasing new plants and plant-related technology onto the market, some of which has been exhibited at major world industry shows. Guy Woodford reports. Astec played an important role in the new Circuit of the Americas Formula 1 racetrack in Austin, Texas. The asphalt base, binder, and surface courses for the 5.47km asphalt road course, which staged its first F1 rac
  • New drilling and blasting technology aids efficient quarrying
    April 13, 2012
    Innovations in drilling and blasting and crushing and screening are bringing major economies of scale to aggregate production operations. Drilling and blasting is an area where new technology is offering major saving to quarrying companies. This is another important factor in the quarrying process, as inefficient drilling and blasting can have major financial repercussions.
  • New drilling and blasting technology aids efficient quarrying
    March 15, 2012
    Innovations in drilling and blasting and crushing and screening are bringing major economies of scale to aggregate production operations. Drilling and blasting is an area where new technology is offering major saving to quarrying companies. This is another important factor in the quarrying process, as inefficient drilling and blasting can have major financial repercussions.