Skip to main content

Eyes on the road

A US driver has lodged a contender for the world's most feeble excuse for an accident following an incident near to his home in Oklahoma. The 68-year-old was on his way home from church when he drove his pick-up truck into a 2tonne elephant, and then claimed that he had not initially seen it.
February 22, 2012 Read time: 1 min
A US driver has lodged a contender for the world's most feeble excuse for an accident following an incident near to his home in Oklahoma. The 68-year-old was on his way home from church when he drove his pick-up truck into a 2tonne elephant, and then claimed that he had not initially seen it. The 2.44m high elephant had escaped from a nearby circus and suffered a broken tusk and an injured leg in the incident, although the accident could have been much worse had the driver not seen the fugitive animal at the last moment and swerved to avoid a head-on impact. The animal was attended to by a vet but was not seriously hurt. The driver's ego has been somewhat dented however.

Related Content

  • A pothole damage breakthrough?
    April 11, 2013
    Academic research by two universities in the same UK city shows that patch repairs on potholes could be far more durable if a few simple techniques were consistently used. Guy Woodford reports. Repairing pothole damage to highways and vehicles across Europe costs responsible authorities and individual motorists hundreds of millions of euros each year. Yet it has cost just €20,204 to make the potentially crucial first step in identifying a method of keeping highways across the continent and beyond pothole fr
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • The payload answer for ADT haulage?
    July 8, 2016
    Will increased ADT load capacity provide a suitable solution to increasing aggregate and earthmoving haulage needs? Mike Woof reports The rule of thumb with off-highway machinery is that for bulk operations, larger equipment can deliver economies of scale, with bigger payloads allowing a better cost/tonne. Heavier machines may be less versatile than more compact units, so a type of equipment that retains its versatility as it is scaled up in size can offer major benefits. For the articulated dumptruc
  • Very under the influence
    December 18, 2017
    When a doctor crashed his car in the UK recently police were quickly at the scene of the incident and breathalysed the driver. He was found to have a blood alcohol count three times that of the permitted level. He explained that immediately after the crash he crawled from his wrecked BMW, opened a bottle of vodka he had with him and drank from this in a bid to steady his nerves. However this explanation was not believed in court as the man had been drinking the night before and was thought to still have