Skip to main content

Exclusively golf

Golf fanatics with money to burn can now invest in an exclusive buggy that is built to order. Costing some US$64,000, the buggy is assembled in the same factory used to build Porsche’s Boxster and Cayman models. Meanwhile structural components for this performance buggy are made by the same firm supplying Aston Martin and Jaguar. With its top speed of 56km/h, the buggy can hardly match the Aston Martin, Jaguar or Porsche models for performance although it is said to offer similar levels of build quality and
February 28, 2012 Read time: 1 min
Golf fanatics with money to burn can now invest in an exclusive buggy that is built to order. Costing some US$64,000, the buggy is assembled in the same factory used to build Porsche’s Boxster and Cayman models. Meanwhile structural components for this performance buggy are made by the same firm supplying Aston Martin and Jaguar. With its top speed of 56km/h, the buggy can hardly match the Aston Martin, Jaguar or Porsche models for performance although it is said to offer similar levels of build quality and comfort at least. It can also be specified in road legal format if required.

Related Content

  • Caterpillar closing two manufacturing plants
    April 4, 2017
    Caterpillar is closing its factories in Aurora Illinois and at Gosselies in Belgium, with the loss of around 3,000 jobs in all. The Aurora facility makes wheeled loaders, with production being switched over to facilities at Decatur, also in Illinois, as well as North Little Rock in Arkansas. This will result in the loss of 800 jobs at the Aurora plant although there will be more personnel required at the Decatur and North Little Rock facilities that will offset the losses Meanwhile the firm says that the
  • Sand, gravel and asphalt, building Poland’s roads
    February 24, 2012
    A new quarry is producing top quality aggregates for Poland's massive road construction programme writes Claire Symes. Wakoz Beton's Glazica sand quarry in Poland is a major source of high quality sand and gravels for the Gdansk construction market. The site is modern and only opened in 2006 but Wakoz Beton has continued to invest in facilities to improve its efficiency and output quality. The installation of a CDE mobile washing plant at the site last year is allowing it to provide materials for concrete.
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public
  • Productive wheeled loaders from Hitachi
    March 4, 2025

    Hitachi says that its latest ZW-7 wheeled loaders offer high productivity and output. The firm says that its wheeled loaders with protective safety features and high comfort cabs. High performance and efficiency are claimed, with uptime due to durable components and easy maintenance.