Skip to main content

Eurovia races against the clock for London’s Race of Champions

Fast-track construction has taken on a new meaning following the successful staging of the Race of Champions in London’s Olympic Stadium. The knockout tournament for the world’s best drivers – won by Formula 1 driver Sebastian Vettel – required a super-fast construction and dismantling of a safe, high-speed circuit within the Queen Elizabeth Olympic Stadium. Eurovia UK had just four weeks to design the track, complete trials and mobilise for the project following the contract award. The circuit was co
June 17, 2016 Read time: 2 mins
And the winner is Eurovia UK
Fast-track construction has taken on a new meaning following the successful staging of the Race of Champions in London’s Olympic Stadium.

The knockout tournament for the world’s best drivers – won by Formula 1 driver Sebastian Vettel – required a super-fast construction and dismantling of a safe, high-speed circuit within the Queen Elizabeth Olympic Stadium. 3281 Eurovia UK had just four weeks to design the track, complete trials and mobilise for the project following the contract award.

The circuit was constructed in one week, allowing organisers three days for driving practice ahead of the event last November. Afterwards, the project team had 36 hours to remove the track, but accomplished this in just 25 hours.

Eurovia contracting business manager Dave Boswell said tight control of logistics was essential, given the complexity of the project and constraints on Eurovia’s access to the stadium.

Working in conjunction with the Race of Champions team, the track was designed by technical consultancy 2374 Jean Lefebvre (UK). It was constructed with recycled road planings laid on aluminium trackway panels to protect the pitch’s underground heating. The 150mm base layer was then overlaid with SMA binder and a thin surface course paved in Echelon.

Sims Milling & Eurovia Roadstone processed the materials after laying trials at its Bull Lodge quarry in Essex. Conventional wheeled, tracked and midi-pavers were used to lay different grades of planings. Sims Milling also demonstrated that the material could be removed by cold milling without damaging the aluminium plates.

Around 3,000tonnes of road planings and 1,800tonnes of asphalt were used in the construction of the 8,000m2 circuit. It required 1,000 plates provided by Davis Trackway, which played a similar role for the opening ceremony of the 2012 Olympics.

For more information on companies in this article

Related Content

  • Rebuilding the busy Frankfurt Airport in Germany
    September 12, 2017
    Handling up to 450 take-offs/day, Runway West is Frankfurt Airport’s busiest runway. Over 50% of the aircraft taking off from the airport uses Runway West, and a point worth noting is that this German airport is one of the busiest in Europe. In 2016, Frankfurt Airport handled nearly 61 million passengers, surpassed by Schiphol in Amsterdam and Charles de Gaulle in Paris, Europe’s third and second busiest airports respectively. Meanwhile London’s Heathrow remained Europe’s busiest airport
  • Roadtec machines deliver Alaska runway rebuild
    January 26, 2017
    A challenging airport runway project in Alaska has been carried out with the help of Roadtec construction equipment equipped with Topcon machine control systems. Anchorage-based Knik Construction carried out the work at the airport in Yakutat, located in the southeast corner of Alaska. Bounded by the Gulf of Alaska to the South, mountains to the North, and coastal glaciers to the East and West, Yakutat is remote even for Alaska. There are no roads leading in or out and all commerce and access is by air o
  • Runway resurfacing in Sardinia with Wirtgen machines
    December 7, 2017
    The fleet used comprised two Wirtgen W 210s and one W 200i, as well as two Wirtgen WR 2000 soil stabilisers. Located roughly 8 km north-west of the city of Alghero, Alghero-Fertilia Airport is one of three commercial airports on the Italian island, along with Cagliari Elmas and Olbia. Built as a military airport in the late 1930s, Alghero-Fertilia still occasionally handles military aircraft. However commercial flights represent its main traffic and as it serves the provinces of Sassari and Oristano, it is
  • Road paving record set
    July 10, 2020
    Aggregate Industries has set what it believes to be a road paving record.