Skip to main content

Eurovia races against the clock for London’s Race of Champions

Fast-track construction has taken on a new meaning following the successful staging of the Race of Champions in London’s Olympic Stadium. The knockout tournament for the world’s best drivers – won by Formula 1 driver Sebastian Vettel – required a super-fast construction and dismantling of a safe, high-speed circuit within the Queen Elizabeth Olympic Stadium. Eurovia UK had just four weeks to design the track, complete trials and mobilise for the project following the contract award. The circuit was co
June 17, 2016 Read time: 2 mins
And the winner is Eurovia UK
Fast-track construction has taken on a new meaning following the successful staging of the Race of Champions in London’s Olympic Stadium.

The knockout tournament for the world’s best drivers – won by Formula 1 driver Sebastian Vettel – required a super-fast construction and dismantling of a safe, high-speed circuit within the Queen Elizabeth Olympic Stadium. 3281 Eurovia UK had just four weeks to design the track, complete trials and mobilise for the project following the contract award.

The circuit was constructed in one week, allowing organisers three days for driving practice ahead of the event last November. Afterwards, the project team had 36 hours to remove the track, but accomplished this in just 25 hours.

Eurovia contracting business manager Dave Boswell said tight control of logistics was essential, given the complexity of the project and constraints on Eurovia’s access to the stadium.

Working in conjunction with the Race of Champions team, the track was designed by technical consultancy 2374 Jean Lefebvre (UK). It was constructed with recycled road planings laid on aluminium trackway panels to protect the pitch’s underground heating. The 150mm base layer was then overlaid with SMA binder and a thin surface course paved in Echelon.

Sims Milling & Eurovia Roadstone processed the materials after laying trials at its Bull Lodge quarry in Essex. Conventional wheeled, tracked and midi-pavers were used to lay different grades of planings. Sims Milling also demonstrated that the material could be removed by cold milling without damaging the aluminium plates.

Around 3,000tonnes of road planings and 1,800tonnes of asphalt were used in the construction of the 8,000m2 circuit. It required 1,000 plates provided by Davis Trackway, which played a similar role for the opening ceremony of the 2012 Olympics.

For more information on companies in this article

Related Content

  • WJ acquires Euromark GB, the roadmarkings business of Eurovia UK
    December 11, 2015
    UK road marking business WJ has acquired Euromark GB, the road marking division of Eurovia UK, for an undisclosed sum. Euromark, formerly Ringway Roadmarking, manufactures and installs road marking throughout UK to local authorities. It employs around 450 people and WJ said there would be no redundancies.
  • RiverLinx consortium inks London’s Silvertown Tunnel deal
    November 27, 2019
    The RiverLinx consortium has reached financial close on the €1.17 billion Silvertown Tunnel project after a three-year procurement process by the client Transport for London.
  • Deep and wide with Wirtgen’s W 100 CFi compact milling machine
    May 14, 2018
    The spread of fibre-optic cables, especially for broadband internet access, is advancing rapidly across the world. The Upper Austrian district of Schärding, not far from the German border, is no exception. Engelhartszell is the second community to benefit from this technology. And the contractor, Hemmelmair Frästechnik from Linz, is also making use of cutting-edge technology - in this case made from steel and carbide. A Wirtgen W 100 CFi compact milling machine with deep milling unit is being used for tren
  • Meeting the challenge of desert runway resurfacing
    February 8, 2012
    Ferocious daytime temperatures can provide a tough challenge to construction firms working in desert conditions in Egypt's south. Despite the high daytime temperatures however, Egyptian contractor Orascom has managed to complete an airport project on budget and ahead of schedule, while meeting the client's tight specifications.