Skip to main content

Eurotec plant for port development

A Japanese contractor bought its second Eurotec ECO60 concrete batching plant, which has been used for a port development project in Madagascar.
August 2, 2023 Read time: 3 mins
A Eurotec batching plant has played an important role in development of a port facility in Madagascar

The contractor is a long-time customer of Lintec & Linnhoff and had been very satisfied with the performance of its Eurotec ECO60 concrete batching plant, as well as the aftersales support from the supplier. So when the firm won a contract for the Toamasina project on Madagascar’s east coast, it ordered the second unit to support its work on the Toamasina Port Development Project (Phase 2).

“This customer always has a need for high productivity and reliable plant, which is why they took advantage of the ECO60 plant’s performance and reliability. In order to meet the new project’s requirements for more complex concrete mix designs, they upgraded that first ECO60 model from three aggregate bins to five bins,” explained R Sakthi, CEO, Lintec & Linnhoff Concrete. “So after they witnessed it could deliver the high performance they wanted, they ordered another ECO60 plant with five aggregate bins.”

The ECO60’s modularised structure allows fast installation and easy maintenance. It started producing a consistent mix of concrete volume for a range of tasks on the Toamasina Port Development Project.

The new quay and container storage area, already the largest commercial port in Madagascar, is expected to increase Toamasina’s port handling capacity. On top of that, the deepened berths allow more and larger cargo and container ships to dock.

The stationary Eurotec ECO60 provides an affordable and reliable solution for customers requiring an economical concrete batching plant with high-quality concrete. The customer can also customise the number of aggregate bins (three-six inline bins) according to a project’s mix requirements.

The model produces up to 60m3/hour of ready-mix concrete in batches of 1m3. The consistency of the mix is ensured by the weighing and batching systems that are metered using load cells. This is managed with Eurotec’s own in-house ECS process-control system software that runs on Windows OS for fully automatic operations.

A twin-shaft mixer allows high-volume production and rigorous mixing intensity. Its robust steel structure and thick interior abrasion-proof linings ensure long-lasting durability. Located at 90° intervals, the double-mixing spiral paddle structure delivers abrasion-resistance and high-performance production than conventional mixers.

The long-running Toamasina Port redevelopment program has already witnessed major improvements, with port handling capacity rising from just 60tonnes/day to 2,500tonnes/day. In addition, bottlenecks that would see full containers waiting for an average of 20 days have been eliminated.

Toamasina now handles 90% of Madagascar’s container traffic and more than 80% of all the country’s trade traffic, making it a leading regional hub. The latest phase of the project will make a significant contribution to Madagascar’s economic development. 

For more information on companies in this article

Related Content

  • Crushing and screening advances introduced
    June 10, 2019
    New developments in crushing and screening equipment as well as washing technology will deliver benefits for materials production - Mike Woof writes Competition is tough in the market for quarry material processing equipment, with key firms introducing new systems that are said to boost capacity and performance. Firms offering crushing and screening equipment have expanded their respective ranges, offering additional capabilities for these segments. Mobility and versatility have been key factors in the d
  • Successful resurfacing at New York's JFK Airport
    February 8, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.
  • Successful resurfacing at New York's JFK Airport
    May 3, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.
  • Strong interest for construction equipment show
    February 21, 2012
    Most of the major manufacturers of extraction and crushing equipment worldwide will be present at the upcoming Hillhead show, either directly or through local distributors. Set in a working quarry, the Hillhead exhibition has set a lead for the quarrying sector. An industry only show, the event is being held this year at the Hillhead Quarry, Buxton in the UK on 22-24 June.