Skip to main content

Erosion protection from Huesker

The Huesker Group is offering a novel solution to reduce the risk of erosion for transport infrastructure located in coastal areas. The firm has developed geotextile container systems that feature large-format tubes and bags.
July 12, 2022 Read time: 2 mins
Huesker offers a novel solution to prevent erosion of infrastructure in coastal areas

According to the firm, these offer effective erosion protection and provide economic and ecological alternatives to conventional construction methods.

The novel SoilTain coastal protection solutions can be individually prefabricated and are filled in-situ with locally available soils (usually sand). The range of solutions includes the proven SoilTain Tubes and SoilTain Bags and the new SoilTain Bags Xtreme.

The company offers two main systems: large-format geotextile tubes filled hydraulically with sand (SoilTain Tubes) and mechanically filled SoilTain Bags. Apart from the filling method, the two geotextile sand container elements differ in size, with sand bags being used for a volume of up to 2.5m³ and geotextile tubes having a capacity of several hundred m3.

SoilTain tubes are manufactured from geosynthetic fabrics of up to 1,000grammes/m², with standard lengths up to 50m. They are filled with a suspension of locally available sand via inlets. The sand-coloured, abrasion-resistant and UV-resistant fabric blends in with the landscape.

The new generation SoilTain Bags Xtreme sandbags are particularly robust and vandalism resistant. Conventional SoilTain Bags are small-format sand containers for all applications in shore and coastal protection. They are made of geotextiles with mass of 600-1,000grammes/m² and usually with a filling volume of 1m³. They are easy to handle and can be used for temporary and permanent applications.

The new SoilTain Xtreme material offers increased UV stability, a high sand accretion capacity and resistance to abrasion and vandalism. The basis weight of 1,200-1,800grammes/m² of the sand-coloured, two-layer non-woven fabric offers robustness and durablilty. These offer filling volumes of up to 2.5m³ in exposed locations and on beaches.

For more information on companies in this article

Related Content

  • Doha’s massive ring road expressway project
    July 10, 2019
    The huge Doha ring road project will help decongest the city and improve transport for Qatar
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Compact concrete
    February 6, 2012
    Lightweight and versatile, the new Lightning Strike screed is said to offer a productive option for concrete construction. This roller screed features easy transport and can be set up by a single person, while requiring just two for use. The screed can be used for an array of applications including pervious concrete or low slump mud as well as the capability to do uphill, downhill or circular pours. Featuring aluminium tubes this units is around half the weight of conventional roller screeds, reducing trans
  • Productive recycling from BOMAG
    May 15, 2017
    According to BOMAG its powerful new RS500 recyclyer/stabiliser is already proving its worth on construction sites in Germany and France. Every construction site has its special requirements and places different demands on people and machines. Since the start of series production, the RS 500 recycler/stabiliser has been able to contribute its versatility on a number of diverse construction sites. On the A 39 Autobahn near Winsen (Luhe) for example, where 8,000m² was processed/day at a working depth of 200mm,