Skip to main content

Erosion protection from Huesker

The Huesker Group is offering a novel solution to reduce the risk of erosion for transport infrastructure located in coastal areas. The firm has developed geotextile container systems that feature large-format tubes and bags.
July 12, 2022 Read time: 2 mins
Huesker offers a novel solution to prevent erosion of infrastructure in coastal areas

According to the firm, these offer effective erosion protection and provide economic and ecological alternatives to conventional construction methods.

The novel SoilTain coastal protection solutions can be individually prefabricated and are filled in-situ with locally available soils (usually sand). The range of solutions includes the proven SoilTain Tubes and SoilTain Bags and the new SoilTain Bags Xtreme.

The company offers two main systems: large-format geotextile tubes filled hydraulically with sand (SoilTain Tubes) and mechanically filled SoilTain Bags. Apart from the filling method, the two geotextile sand container elements differ in size, with sand bags being used for a volume of up to 2.5m³ and geotextile tubes having a capacity of several hundred m3.

SoilTain tubes are manufactured from geosynthetic fabrics of up to 1,000grammes/m², with standard lengths up to 50m. They are filled with a suspension of locally available sand via inlets. The sand-coloured, abrasion-resistant and UV-resistant fabric blends in with the landscape.

The new generation SoilTain Bags Xtreme sandbags are particularly robust and vandalism resistant. Conventional SoilTain Bags are small-format sand containers for all applications in shore and coastal protection. They are made of geotextiles with mass of 600-1,000grammes/m² and usually with a filling volume of 1m³. They are easy to handle and can be used for temporary and permanent applications.

The new SoilTain Xtreme material offers increased UV stability, a high sand accretion capacity and resistance to abrasion and vandalism. The basis weight of 1,200-1,800grammes/m² of the sand-coloured, two-layer non-woven fabric offers robustness and durablilty. These offer filling volumes of up to 2.5m³ in exposed locations and on beaches.

For more information on companies in this article

Related Content

  • Major Europe-Asia bridge connection in Turkey
    July 1, 2014
    The 3rd Bosporus Bridge and the Northern Marmara Motorway will improve transport links between Europe and Asia and cut chronic congestion in Istanbul, Turkey’s largest city - Mike Woof reports Work is now well underway on the 3rd Bosporus Bridge and the Northern Marmara Motorway, providing a new link for Turkish city Istanbul and the region as a whole. This enormous bridge and highway project is breaking several records for Turkey in terms of scale, as well as setting a number of international records for e
  • Breaking with Indeco hammers
    April 16, 2018
    Contractor New Hampshire Rock Reduction is using hydraulic hammers from Indeco for rock breaking and excavation duties. The firm says that it selected these units so as to optimise productivity and has used the breakers in quarrying as well as site development applications. Located in the northeast corner of the US, New Hampshire is one of the country’s smallest states. Noted for a rocky terrain, New Hampshire’s geology includes a heavy presence of metamorphic, especially igneous, rock formations, which yi
  • Formwork plays a leading role in global infrastructure projects
    June 13, 2012
    New and highly regarded existing formwork systems have been used in major recent transport-related construction projects across the globe. Guy Woodford looks at some of their applications The multi-million dollar Mississippi River Bridge project in the United State is creating a vital new gateway between Illinois and Missouri. Central to the project is the realignment and reconstruction of Interstate 70 and a new landmark bridge, featuring two pylons projecting vertically from the Mississippi river bed w
  • IRF Global Road Achievement Award Laureate
    January 5, 2016
    As a key engineering project on the Changsha-Chongqing Expressway in Southwest China, the Aizhai Bridge, constructed by the Hunan Road & Bridge Construction Group, was opened to traffic in March 2012. The Aizhai Bridge crosses the 1000m-wide scenic Dehang Canyon at an elevation of 355m. It has a main span of 1,176m, making it the world’s longest canyon-crossing bridge in the world. The erection of the main girder (the stiffening girder) of the Aizhai Bridge encountered serious challenges, including a la