Skip to main content

Erosion protection from Huesker

The Huesker Group is offering a novel solution to reduce the risk of erosion for transport infrastructure located in coastal areas. The firm has developed geotextile container systems that feature large-format tubes and bags.
July 12, 2022 Read time: 2 mins
Huesker offers a novel solution to prevent erosion of infrastructure in coastal areas

According to the firm, these offer effective erosion protection and provide economic and ecological alternatives to conventional construction methods.

The novel SoilTain coastal protection solutions can be individually prefabricated and are filled in-situ with locally available soils (usually sand). The range of solutions includes the proven SoilTain Tubes and SoilTain Bags and the new SoilTain Bags Xtreme.

The company offers two main systems: large-format geotextile tubes filled hydraulically with sand (SoilTain Tubes) and mechanically filled SoilTain Bags. Apart from the filling method, the two geotextile sand container elements differ in size, with sand bags being used for a volume of up to 2.5m³ and geotextile tubes having a capacity of several hundred m3.

SoilTain tubes are manufactured from geosynthetic fabrics of up to 1,000grammes/m², with standard lengths up to 50m. They are filled with a suspension of locally available sand via inlets. The sand-coloured, abrasion-resistant and UV-resistant fabric blends in with the landscape.

The new generation SoilTain Bags Xtreme sandbags are particularly robust and vandalism resistant. Conventional SoilTain Bags are small-format sand containers for all applications in shore and coastal protection. They are made of geotextiles with mass of 600-1,000grammes/m² and usually with a filling volume of 1m³. They are easy to handle and can be used for temporary and permanent applications.

The new SoilTain Xtreme material offers increased UV stability, a high sand accretion capacity and resistance to abrasion and vandalism. The basis weight of 1,200-1,800grammes/m² of the sand-coloured, two-layer non-woven fabric offers robustness and durablilty. These offer filling volumes of up to 2.5m³ in exposed locations and on beaches.

For more information on companies in this article

Related Content

  • Council acts on coastal road erosion
    June 24, 2013
    Work has started on repairing an important road near Silloth in Cumbria, North West England to save it from coastal erosion. The scheme, on the B5300 Maryport to Silloth road, will see a 280m length of rock armour constructed to protect the sand and gravel bank on which the road runs at Castle Corner between Mawbray and Beckfoot. Costing €385,942 (£320,000), the work being carried out by Cumbria County Council’s in-house highways team follows approval from the Council’s cabinet to fund a new sea defence bui
  • Cold milling popular for road materials recycling
    July 4, 2012
    Milling techniques remain one of the most widely used recycling methods Well-proven, cold milling techniques remain one of the most widely used methods for materials recycling in road construction. Milled road materials can be cleaned up and re-used in both asphalt and concrete highway construction. German firm Wirtgen has long dominated the market for road milling machines and has the largest share of the sector (as well as the broadest product range), although other firms based in Europe and the US are be
  • Cold milling popular for road materials recycling
    March 2, 2012
    Milling techniques remain one of the most widely used recycling methods
  • Tunnel construction benefits from improved visibility
    November 14, 2012
    Major new tunnel construction projects will, on completion, help secure more reliable journey times for hundreds of thousands of people across the world. Meanwhile, as Guy Woodford reports, leading ITS solution companies have been providing vital equipment for major road tunnels The Martina Tunnel Boring Machine (TBM), a 4,500tonne Herrenknecht Earth Pressure Balance Shield said to have a world record diameter of 15.55m, has required just under a year to build the first of two tunnel tubes for the 2.5km lon